算BuildCalc

Section Steel Weight Calculator

Pick a section type, enter height, flange width and thickness to get weight per metre, per piece and total tonnage.

Quick answer

With the default inputs: Section type H-beam · Section height h 200 · Flange width b 200 etc.Theoretical weight per metre 48.73 kg/m

Edit the inputs below to recalculate.
Section height h mmFlange width b mmWeb thickness tw mmFlange thickness t mm
h is overall depth, b flange width, tw web thickness, tf flange thickness. Tabulated weights come from exactly these four; swapping tw and tf shifts mass per metre by over 10%.

Inputs

Overall depth, e.g. HW200 -> 200
For channels use the width of one flange
I-beams and channels taper; use average flange thickness
pcs

Result

Theoretical weight per metre
48.73kg/m
Section area6208mm²
Weight per piece584.79kg
Total weight5847.9kg
Total tonnage5.848t
Density used7850kg/m³

Rectangular approximation without root radii, typically 1-3% lighter than the GB/T 706 section tables. Use official mill tables for ordering and settlement.

Formula

H / I beam areaA = 2 × b × tf + (h − 2tf) × tw
Channel areaA = h × tw + 2 × b × tf
Weight per metreg = A(mm²) × 7.85 ÷ 1000 (kg/m)
Total weightW = g × length × quantity
HW200×200×8×12, 12 m long, 10 pieces: A = 6208 mm², 48.73 kg/m, 584.8 kg each, 5.85 t total (the GB table gives 49.9 kg/m; the gap is the root radius).

How to work it out

  1. Expand the section area by type: H-section A = 2b·tf + (h − 2tf)·tw; rectangular hollow A = 2(h + b − 2t)t; circular hollow A = π(D − t)t.
  2. Unit weight = area (mm²) × 0.00785 ÷ 1000, or simply read the section table, which is both quicker and more accurate.
  3. Multiply by length and count for the total tonnage.
  4. H-sections come as HW (wide flange), HM (medium) and HN (narrow); the same depth in different series differs enormously in weight, so depth alone tells you nothing.
  5. Welded H-sections use the same formula, but add 1-3% for weld metal and allow for plus tolerance on flange width.

Where it goes wrong

Material and cost

Q235 H-section 4200-5000 CNY/t, Q355 4600-5600, welded H-section 4500-5500 including fabrication, hot-dip galvanising adds 800-1200.

On site

Basis

FAQ

Why is the result slightly lighter than the mill table?
The section is treated as joined rectangles, ignoring root radii at the flange-web junction, which add real material (about 2% for HW200×200). A 1-3% gap is normal; a 10% gap means a wrong input, typically using a channel's overall width instead of one flange.
What actually differs between H-beams, I-beams and channels?
I-beams have tapered inner flange faces and poor lateral resistance at greater depths. H-beams have parallel, equal-thickness flanges and a wide flange, giving good bending and torsional behaviour (HW wide, HM medium, HN narrow). Channels are open C sections used for purlins and bracing; they are singly symmetric and buckle laterally under compression.
Why 7850 kg/m³ for steel?
7850 kg/m³ (7.85 g/cm³) is the conventional density for carbon structural steel used by GB/T 709 and the section tables. Stainless is about 7930, aluminium 2700, cast iron 7200. Mixing densities between parties creates a few per mille of drift, so agree on one.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Section Steel Weight Calculator. 2026-10-25. https://jianzhujisuan.com/en/section-steel-weight

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.