Slope Stability Calculator
Resisting force over driving force for a single planar slip surface, checked against Fst.
Also known as slope stability analysis · factor of safety slope · slip circle
With the default inputs: Slope height 6 m · Slope safety class Class 2 · Design case Permanent, normal etc.Factor of safety 1.87
Use your own dimensions ↓Inputs
Result
| Sliding wedge weight | 695kN/m |
| Slip surface length | 14.20m |
| Resisting force | 548kN/m |
| Driving force | 294kN/m |
| Required Fst | 1.30 |
| Stability state | Stable |
How this is worked out
Planar sliding is the simplest limit-equilibrium method: a homogeneous slope is cut along a plane into a wedge, resisting force = normal component × tanφ + cohesion × slip length, and driving force = the tangential component. Classification follows GB 50330-2013 clause 5.3: Table 5.3.1 has four states - Fs < 1.00 unstable, 1.00 ≤ Fs < 1.05 marginally unstable, 1.05 ≤ Fs < Fst basically stable, Fs ≥ Fst stable; Fst comes from Table 5.3.2 - for permanent slopes under normal conditions 1.35 / 1.30 / 1.25 for classes 1 / 2 / 3, under seismic 1.15 / 1.10 / 1.05, and 1.25 / 1.20 / 1.15 for temporary slopes. Fst is not a flat 1.5; the 1.5 quoted in textbooks is a rule of thumb, not the value in this code. It only holds for homogeneous soil and a single plane; layered ground and circular slips need a method of slices (Bishop and so on). Take the slip angle at the most critical surface - start near the slope angle and hunt for the lowest Fs. Slopes for deep excavations are governed separately by JGJ 120-2012.
Next up: High Strength Bolt Torque Calculator · Plaster and Render Calculator
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Wedge weight | W = ½·γ·H·(H/tanα) |
| Slip length | L = H / sinα |
| Resisting | R = W·cosα·tanφ + c·L |
| Driving | T = W·sinα |
| Factor of safety | Fs = R / T |
| State | Fs≥Fst stable; 1.05≤Fs<Fst basically stable; 1.00≤Fs<1.05 marginally unstable; Fs<1.00 unstable |
How to work it out
- Use the planar-sliding method: treat the sliding mass as a rigid block on a plane, with safety factor K = resisting force ÷ driving force.
- Resisting = W·cosα·tanφ + c·L (W block weight, α slip angle, φ friction angle, c cohesion, L slip-plane length).
- Driving = W·sinα, so K = (W·cosα·tanφ + c·L) / (W·sinα).
- Judge stability at K ≥ 1.2-1.3, taking the limit by slope safety class and loading case.
- Note: this only fits homogeneous soil and a single plane; clay usually fails on a circle, so use a method of slices (Bishop, Janbu, etc.).
Where it goes wrong
- Forcing planar sliding onto layered soil or weak seams - the real surface is circular or along the seam, so the planar K reads high and misleads.
- Using peak strength and ignoring the long term - cohesion c decays with time (especially soft and swelling soils), so peak-c K is optimistic.
- Ignoring groundwater - a rising table raises pore pressure, drops effective stress, and K plunges; many slopes fail after rain.
Material and cost
Remediating a failed slope (regrading, retaining wall, anti-slide piles, anchors, drainage) costs several times prevention, plus downtime and secondary damage. Compute K and act on it early - that is the cheapest option.
On site
- For clay and layered soils switch to circular-slip slice methods, not a forced planar calculation.
- Account for groundwater and long-term strength; use effective-stress parameters.
- Keep the crest clear of stockpiles and heavy plant, and never excavate the toe casually.
Basis
The codes below are listed for comparison. This calculator returns GB 50330-2013 values only.
- Implemented: GB 50330-2013 (China) - the values this calculator returns
- EN 1997-1:2004, Section 9 and Annex C (factor of safety on slope stability)
- BS 6031:2009 Code of practice for earthworks, Section 9 (slope stability)
- FHWA Circular No. FHWA-0-IF-04-018 Soil Slope and Embankment Design Reference Manual
- IS 7894:1975 Code of Practice for Stability Analysis of Earth Slopes
FAQ
What factor of safety is acceptable?
Is planar sliding accurate enough?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Slope Stability Calculator. 2026-10-25. https://jianzhujisuan.com/en/slope-stability