Round, Square and Flat Bar Weight Calculator
Mass per metre and total for round, square and flat bar.
With the default inputs: Bar type Round bar · Size a 20 · Flat bar thickness 6 etc.Total mass 148.08 kg
Edit the inputs below to recalculate.Inputs
Result
| Type | Round bar |
| Mass per metre | 2.468kg/m |
| Mass each | 14.808kg |
| Total length | 60.00m |
| Section area | 314.16mm² |
| In tonnes | 0.1481t |
| Length per tonne | 405.2m/t |
| Surface area | 3.77m² |
The 0.00617 factor for round bar is π/4 × 7.85 ÷ 1000, the same formula as rebar (Φ20 round bar is 2.468 kg/m). Square and flat use 0.00785. All three are the same steel; only the section differs, so a wrong answer usually means the wrong formula was used.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Round | W = 0.00617 × d² in kg/m |
| Square | W = 0.00785 × a² in kg/m |
| Flat | W = 0.00785 × a × b in kg/m |
| Total | per metre × length × quantity |
| Section area | πd²/4, a², a×b |
| Factor origin | 0.00617 = π/4 × 7.85 ÷ 1000 |
How to work it out
- Pick the shape first, since the three sections use different formulas: round W = 0.00617 × d², square W = 0.00785 × a², flat W = 0.00785 × a × b.
- All dimensions in mm give kg/m directly. The 0.00617 for round bar is π/4 × 7.85 ÷ 1000.
- Multiply by length for one piece and by the count for the total.
- When ordering by piece, note the stock lengths (mostly 6 m, some 9 m) and the length tolerance of +50 mm.
- Surface treatment adds weight separately — hot-dip galvanising is about 3-5%.
Where it goes wrong
- One formula for all three shapes — at the same nominal size round and square differ by 21% (0.00617 against 0.00785), so the wrong formula is a fifth out.
- Giving flat bar only a width — it is a rectangle and needs both dimensions; treated as square it grossly overstates the weight.
- Using the outside diameter for deformed bar — the nominal diameter is an equivalent section diameter and the actual outside dimension is larger; nominal is what the weight is based on.
- Ignoring minus tolerance — hot-rolled bar is toleranced ±0.4 to ±1.0 mm, proportionally larger on small diameters.
Material and cost
Q235 round bar 4000-4800 CNY/t, 45# 4500-5500, square and flat 4100-4900, stainless 304 round bar 18000-26000.
On site
- Rebar uses d²/162, which is identical to 0.00617 d² — the two formulas cross-check each other.
- On flat bar, width is the long side and thickness the short side; drawings write -50×6 for 50 wide by 6 thick.
- Small diameters deviate proportionally more, so settle by weighbridge on accurate work.
Basis
- GB/T 702-2017 Hot-rolled steel bars — dimensions, shape, mass and tolerances
- GB/T 1499.1-2017 Steel for reinforced concrete, Part 1 (plain bars)
- GB/T 1499.2-2018 Steel for reinforced concrete, Part 2 (ribbed bars)
FAQ
Are round and ribbed bars interchangeable?
Why is the formula the same for rebar and round bar?
Does flat bar orientation matter?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Round, Square and Flat Bar Weight Calculator. 2026-10-25. https://jianzhujisuan.com/en/steel-bar-weight