算BuildCalc

Steelwork Paint Calculator

Tonnage to surface area to paint quantity for protective coating.

Quick answer

With the default inputs: Steel tonnage 10 t · Area per tonne 28 m²/t · Number of coats 2 courses etc.Paint to order 136.8 kg

Edit the inputs below to recalculate.

Inputs

t
m²/t
Heavy plate 15-25, rolled sections 25-35, light purlins 40-55
courses
μm
120-150 μm total outdoors, 100-125 μm indoors
%
Zinc-rich epoxy 50-60%, alkyd 40-50%, fluorocarbon 55-65%
g/cm³
×
Brush 1.3-1.4, air spray 1.6-1.8, airless 1.4-1.6

Result

Paint to order
136.8kg
Painting area280.0m²
Total dry film120μm
Theoretical quantity85.53kg
With loss136.84kg
Per square metre0.489kg/m²
Per tonne of steel13.68kg/t
Drums at 20 kg7cans

Area per tonne is the crux here: thinner sections carry more surface per tonne of steel. Rolled sections sit around 25-35 m²/t, heavy plate sections only 15-25 m²/t, and light purlins or space frames reach 40-55 m²/t. Theoretical quantity is kg = area × DFT(μm) × density ÷ (1000 × volume solids). Use volume solids, not weight solids — the two differ a lot. The loss factor covers overspray, drum residue and touch-up.

Formula

Painting areaA = tonnage × area per tonne
Theoretical quantityG = A × total DFT × density ÷ (1000 × volume solids)
Actual quantityG = theoretical × loss factor
Per tonneg = actual ÷ tonnage (kg/t)
10 t of sections at 28 m²/t, two 60 μm coats, 55% volume solids, density 1.4 and a 1.6 loss factor: 280 m², 85.53 kg theoretical, 136.8 kg to order, 13.7 kg per tonne.

FAQ

What is the right area-per-tonne figure?
Best is to total the member surface areas from the take-off, or sum section perimeters times lengths. For estimates, use bands by member type: H-section columns and beams 25-30 m²/t, angle and channel trusses 30-40, cold-formed purlins 45-55, heavy plated members (box columns, deep beams) 15-22. Picking the wrong band doubles or halves the paint.
Volume solids or weight solids?
Volume solids is how much solid volume remains after drying and it alone sets the film thickness — you buy paint by volume and deliver by thickness, so volume solids is what the calculation needs. Weight solids depends on pigment density, is used for VOC, and cannot give film build. The two typically differ by ten points or more; using the wrong one leaves you short.
How is dry film thickness controlled?
On site, use a wet film gauge in real time: wet = dry ÷ volume solids, so a 60 μm dry film at 55% solids needs about 110 μm wet. After curing, test with a magnetic gauge at several points per member, taking mean and minimum — the minimum must not fall below 80% of spec and at least 85% of readings must meet it. Too thin kills durability, too thick cracks.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.