Steel Pipe Weight Calculator
Mass per metre, per length and in total from OD and wall thickness.
With the default inputs: Outside diameter 48 · Wall thickness 3 · Length each 6 etc.Total mass 199.75 kg
Edit the inputs below to recalculate.Inputs
Result
| Mass per metre | 3.329kg/m |
| Mass each | 19.97kg |
| Total length | 60.00m |
| Inside diameter | 42.00mm |
| Section area | 424.1mm² |
| In tonnes | 0.200t |
| Metres per tonne | 300.4m/t |
| External surface area | 9.05m² |
| Internal surface area | 7.92m² |
The 0.02466 × t × (D − t) formula assumes 7.85 g/cm³ and applies to round tube only — square and rectangular hollow sections need their own formulas. Cheap tube sells at 2.5-2.8 mm wall, so weights come out light; scaffold checks must use the measured wall thickness.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Mass per metre | W = 0.02466 × t × (D − t) in kg/m |
| Underlying form | W = π(D − t) × t × 7.85 ÷ 1000 |
| Mass each | per metre × length |
| Total mass | mass each × quantity |
| Inside diameter | d = D − 2t |
| Section area | A = π/4 × (D² − d²) |
How to work it out
- Confirm whether diameter and wall thickness are nominal or measured. Theoretical weight uses nominal, invoicing uses weighbridge, and a 3-6% difference is normal.
- Unit weight: W = (D − t) × t × 0.02466, with D and t in mm giving kg/m. The constant already folds in π and a density of 7.85 g/cm³.
- Multiply by the length for one piece, then by the count for the total. Six metres is the standard stock length; 9 and 12 m must be ordered.
- Divide by 1000 for tonnes, or use the unit weight directly when pricing by metre.
- For galvanised tube add the zinc: hot-dip coating is 3-6% by weight at 300-500 g/m², proportionally more on thin walls.
Where it goes wrong
- Treating the tube as a solid bar — a 48 × 3 tube is 3.33 kg/m, not the 14.2 kg/m of a solid 48 mm bar; the (D − t) term is what removes the bore.
- Ignoring the minus wall tolerance — standards allow ±10% and deliveries often come in under, so 100 t theoretical can weigh 94-97 t and pricing on theory loses money.
- Quoting galvanised tube at black tube weight — the zinc is 3-6%, roughly 40-60 kg per tonne at DN100, which adds up on volume work.
- Ignoring cutting loss on stock lengths — cutting 2.5 m pieces from 6 m yields two with 1 m of scrap, 16% waste, so net-length ordering falls short.
Material and cost
Welded steel tube (Q235) 4500-5500 CNY/t, hot-dip galvanised 5500-6800, seamless 6000-9000, stainless 304 18000-26000.
On site
- Scaffold tube at Φ48 × 3.0 is 3.33 kg/m, about 300 m per tonne; the older Φ48 × 3.5 was 3.84 kg/m, so state which when quoting.
- Stainless uses 0.02491 rather than 0.02466 because grade 304 is 7.93 g/cm³, not 7.85.
- Thin walls (t/D below 3%) vary more in weight, so structural work should be checked against measured thickness.
Basis
- GB/T 3091-2015 Welded steel pipes for low pressure liquid delivery
- GB/T 17395-2008 Dimensions, shapes, masses and tolerances of seamless steel tubes
- GB/T 6728-2017 Cold formed hollow steel sections for structural use
FAQ
Why must scaffold tube wall thickness be checked?
How is square or rectangular hollow section weight calculated?
Does galvanising add to the weight?