Steel Plate Weight Calculator

Mass per square metre, per plate and in total from size and thickness.

Quick answer

With the default inputs: Length 2000 · Width 1000 · Thickness 10 etc.Total mass 785.00 kg

Edit the inputs below to recalculate.
Length LDepth HWidth W
Theoretical mass is 7.85 × thickness in kg/m². Use net dimensions; allow cutting waste separately.

Inputs

sheets

Result

Total mass
785.00kg
Area per plate2.000m²
Mass per m²78.50kg/m²
Mass per plate157.00kg
Total area10.000m²
In tonnes0.785t
Plates per tonne6.37sheets
Volume per plate0.0200m³
Both faces20.00m²

Mass per square metre is thickness in mm times 7.85 — the handiest number for plate: 78.5 kg/m² at 10 mm and 157 kg/m² at 20 mm. Checker plate adds a raised pattern, usually taken as the plain thickness times 1.05-1.08.

Formula

AreaA = length (m) × width (m)
Mass per m²W = thickness (mm) × 7.85
Mass per plateA × W
Totalper plate × quantity
ExpandedW = L × W × T × 7850 in metres
Plates per tonneN = 1000 ÷ mass per plate
2000 × 1000 × 10 mm, five plates: 2.000 m² each, 78.50 kg/m², 157.00 kg per plate, 785.00 kg total (0.785 t), about 6.37 plates to the tonne.

How to work it out

  1. Unit weight: 1 mm of steel plate is 7.85 kg/m², so weight per m² = thickness in mm × 7.85. A 10 mm plate is 78.5 kg/m².
  2. Weight per piece = length × width × thickness × 7.85 ÷ 10⁹ with dimensions in mm, or simply area × unit weight.
  3. Multiply by the count for the total. Checker plate adds 2.5-3 kg/m² for the pattern.
  4. Divide by 1000 for tonnes. When buying by piece, remember plates carry length and width tolerances.
  5. For cut or holed plates add 5-10% waste; the cutting method (plasma or shear) sets the offcut width.

Where it goes wrong

Material and cost

Q235B plate 3800-4500 CNY/t, Q355B 4200-5000, stainless 304 18000-26000, aluminium 20000-26000. Cutting 3-15 CNY/m or 200-600 CNY/t.

On site

Basis

FAQ

Why does theoretical plate mass not match the scales?
Because the standard permits negative thickness tolerance — a 10 mm plate may be 9.2 mm, giving 72.2 kg/m² instead of 78.5, an 8% shortfall. Mills deliver on theoretical weight by trade custom, so the calculated total running high is expected; a deviation beyond tolerance means undersized plate, so check with a caliper on delivery.
How do I handle grating and checker plate?
Grating is not area times thickness — makers publish mass per square metre by specification (30 × 3 flat bar at 30 mm pitch is about 30 kg/m²), so use the table. Checker plate is the plain thickness times 1.05-1.08, the pattern being 0.5-1.0 mm high, which barely matters on large plates.
Why is thin sheet more penalised by theoretical weight?
Because tolerance is proportional: a 1 mm sheet permits ±0.1 mm, a 10% band, worse than the 8% on 10 mm plate. Thin sheet also covers more area per tonne, so errors accumulate. Colour-coated sheet at 0.5 mm should be 3.93 kg/m² but often measures 3.5 — the origin of the “thinner every year” complaint.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Steel Plate Weight Calculator. 2026-10-25. https://jianzhujisuan.com/en/steel-plate-weight

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.