Masonry Tie Bar Length Calculator
Total length, count and weight, with seismic embedment rules.
With the default inputs: Wall thickness 240 · Seismic intensity 7 · Wall segment length 4 etc.Total length per tie bar 1238 mm
Edit the inputs below to recalculate.Inputs
Result
| Embedment into wall | 1000mm |
| Anchorage into column | 200mm |
| End hook (6.25d) | 37.5mm |
| Rows along height | 7rows |
| Bars per wall | 14bars |
| Length per wall | 17.3m |
| Weight per wall | 3.8kg |
Per GB 50011, infill walls need ties of 2Φ6 at about 500 mm vertical spacing (3Φ6 where the wall exceeds 240 mm). At intensity 6-7 the embedment into the wall is at least 1000 mm; at 8-9 it is at least one fifth of the wall length and not less than 700 mm. Anchorage into the column must satisfy anchorage rules, or use post-installed bars with pull-out testing. Design drawings govern.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Intensity 6-7: embed ≥ max(1000 mm, wall/5) | |
| Intensity 8-9: embed ≥ max(700 mm, wall/5) | |
| Total = embed + anchorage + hook | hook 6.25d |
| Count = (height ÷ spacing + 1) × bars per row |
How to work it out
- Set the masonry embedment L1 by seismic intensity: at least 700 mm and a fifth of the wall segment at 6 and 7; at least 1,000 mm and a fifth at 8 and 9.
- Embedment into the column or wall L2 follows the design, typically 15d-20d or 200 mm, or the resin anchor depth.
- Total bar length = L1 + L2 + hook, normally 6.25d.
- Courses = ⌊wall height ÷ vertical spacing⌋, with a minimum of two.
- Total weight = bars × length × 0.00617 × d².
Where it goes wrong
- Using a flat 1,000 mm — 6 and 7 require 700, but the parallel condition of a fifth of the wall segment governs on long walls, so 5 m gives 1,000 anyway.
- Omitting the embedment into the column — measure from the anchor point inside the column, or the bar is about 200 mm short.
- Treating the hook as a plain 90° tail — the masonry-side hook is 90° with 6.25d, and without it the bar pulls out as the masonry shrinks.
Material and cost
Φ6 ties run 0.9 per metre; resin anchoring 3-5 per bar. On 1,000 m² of wall at 1 m lengths that is about 2,000 bars — 2,000 in steel but 8,000 in resin, since the anchoring usually costs more than the bar.
On site
- The 'a fifth of the wall segment' condition is easily missed and becomes governing on long walls.
- Where a continuous tie runs the full wall (over-long infill in frames), cut it as one continuous bar with staggered laps.
- Anchor depth starts at 15d and never below 100 mm, with the hole 4-6 mm larger than the bar.
Basis
- GB 50011-2010 Code for seismic design of buildings, clause 13.3.3 (ties to infill walls)
- GB 50003-2011 Code for design of masonry structures, Section 6.3
- JGJ 145-2013 Technical specification for post-installed fastenings in concrete (resin anchors)
FAQ
Why must the tie extend a metre into the wall?
Post-installed bars or cast-in starter bars?
Why three bars for 240 mm walls?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Masonry Tie Bar Length Calculator. 2026-10-25. https://jianzhujisuan.com/en/tie-bar-length