Tie Column Quantity Calculator

Tie column count, concrete, formwork and rebar from wall and section.

Quick answer

With the default inputs: Wall length 20 · Column spacing 4 · Column height 3 etc.Tie columns 6 bars

Edit the inputs below to recalculate.
Section width mmSection depth mm
b and h2 are the tie-column section. The toothed key adds 60 mm per side to the concrete — using axis dimensions under-orders material.

Inputs

Usually not more than 4 m; required when the wall exceeds 5 m
Multiply the section by 1.1-1.2 for toothings

Result

Tie columns
6bars
Section576cm²
Concrete per column0.199m³
Total concrete1.19m³
Formwork area17.28m²
Main bars 4Φ1274.6kg
Stirrups Φ6@20019.3kg
Total rebar93.9kg
Steel per m³79kg/m³

Assumes 4Φ12 main bars and Φ6 hoops at 200 mm; the design governs. Tie columns are cast after the wall, with 60 mm deep toothings alternating five courses in and out, starting with a setback.

Formula

Countn = floor(wall length ÷ spacing) + 1
Concrete per columnV = section × height × toothing factor
FormworkA = n × 2 × (b + h) × height
Main barsL = n × 4 × (height + 2 × 0.5 m)
Stirrup2(b−2c) + 2(h−2c) + 2 × 11.9d
A 20 m wall at 4 m spacing with 240×240 columns 3 m high: 6 columns, 1.19 m³ of concrete, 17.28 m² of formwork and about 93.8 kg of reinforcement — 78 kg per cubic metre.

How to work it out

  1. Count n = ⌊wall length ÷ spacing⌋ + 1. Spacing is typically 4 m, with columns always at corners, tees and both sides of openings, and wherever the wall exceeds 5 m.
  2. Concrete per column = width × depth × height × toothing factor. The toothing factor of 1.10-1.15 accounts for the indented keyway that also gets filled.
  3. Formwork A = n × 2 × (b + h) × height. Only two faces are formed; the other two are the wall.
  4. Main steel = n × 4 × (height + top and bottom anchorage), each anchorage normally 500 mm.
  5. Stirrups: length = 2(b − 2c) + 2(h − 2c) + 2 × 11.9d, count = height ÷ spacing + 1.

Where it goes wrong

Material and cost

C25 concrete about 420 per m³, formwork 55-75 per m² (small areas carry a higher rate), steel around 4,500 per tonne. A 240×240 column 3 m high takes about 0.2 m³, 15 kg of steel and 2.9 m² of formwork — roughly 350-450 each all in.

On site

Basis

FAQ

When are tie columns mandatory?
Common rules: a wall longer than 5 m or twice the storey height needs one at mid-length; over 8 m or 2.5 times the height, add more. Also at unconstrained wall ends, both sides of openings, parapets and stair corners. The purpose is to break long walls into segments so they cannot buckle out of plane.
Why cast the column after the wall?
The column works compositely with the masonry, gripping it through the toothings. Casting first leaves a flat joint relying only on mortar bond with almost no shear capacity — as good as no column at all. The code therefore requires wall first, toothings left, column cast later, with a 50-100 mm gap at the head filled with non-shrink mortar.
How is toothing concrete counted?
Multiply the section by 1.1-1.2. The toothings make the actual section larger than the rectangle — 60 mm deep, five courses in and out, adding roughly 10-20% volume. The precise method is (width + tooth depth) × thickness × height, but the factor is what settlements normally use.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Tie Column Quantity Calculator. 2026-10-25. https://jianzhujisuan.com/en/tie-column

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.