Tile Calculator
Area and tile size to pieces, boxes and thinset.
Also known as tile count · tiles per m2 · tile estimator
With the default inputs: Area to tile 100 ft² · Tile width 12 in · Tile height 24 in etc.Tile pieces 55 pcs
Use your own dimensions ↓Inputs
Result
| Area per tile | 2.000ft² |
| Net pieces | 50pcs |
| Pieces with waste | 55pcs |
| Full boxes | 7boxes |
| Thinset (50 lb bags) | 1bags |
| Grout (approx) | 35lb |
| Area in square yards | 11.1yd² |
How this is worked out
Pieces = area ÷ tile area × (1 + waste) rounded up, then boxes from pieces per box. Waste depends on the layout: 10% for a straight lay, 12% for running bond, 15-20% for diagonal or herringbone, and 15% in small rooms with lots of cutting. Tile must be bought in whole boxes from one shade lot to avoid colour variation, so always round boxes up and keep the surplus. Thinset is estimated at one 50 lb bag per 100 ft² with a 3/8 in notch trowel; large format over 15 in needs a bigger notch and about 1.5 bags. Grout runs about 0.35 lb per ft², though joint width and tile thickness move that a lot.
Next up: Tile Calculator · Tile Adhesive Calculator
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Tile area = W × H ÷ 144 | inches to square feet |
| Pieces = area ÷ tile area × (1+waste) | round up |
| Boxes = pieces ÷ per box | round up |
| Thinset = area ÷ 100 bags | 3/8 in notch, 50 lb bags |
How to work it out
- Measure the net tiled area, deducting baths and cabinet footprints.
- Tile area = width x height ÷ 144 to convert inches to square feet.
- Pieces = area ÷ tile area x (1 + waste), rounded up.
- Boxes then round up from pieces per box - it is sold in whole boxes for a reason: one shade lot.
- Estimate thinset at one 50 lb bag per 100 ft² with a 3/8 in notch, rising to 1.5 bags for large format with a bigger notch.
Where it goes wrong
- A flat 10% waste - diagonal and herringbone need 15-20%, so 10% runs out and the top-up may be a different lot.
- Rounding boxes to the nearest whole - it must be rounded up; half boxes are not sold.
- Using a 3/8 in notch on large format - over 15 in needs 1/2 in, or coverage is short and tiles sound hollow underfoot.
Material and cost
Tile itself is 2-8 per ft² for standard glazed and 8-20 for large format stone-look. A 50 lb bag of thinset is 15-25 and 25 lb of grout 20-35. Laying labour runs USD 5-12 per ft², plus 30-50% for diagonal, patterns and large format on walls. Waterproofing is extra at 3-6 per ft² for wet areas.
On site
- Mix boxes before laying - they can come from different lots and blending is the only way the colour reads even.
- Check the substrate with a straightedge first; out by more than 1/8 in over 10 ft needs levelling or large format will sound hollow.
- Wait at least two hours before grouting, or you drag the thinset out of the joints and they slump.
Basis
- ANSI A108.02 American National Standard Specifications for the Installation of Ceramic Tile
- TCNA Tile Council of North America Handbook (installation methods)
- ISO 13006 / EN 14411 Ceramic tiles — Definition, classification and characteristics
FAQ
How much waste?
How much thinset?
Does it need waterproofing?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Tile Calculator. 2026-10-25. https://jianzhujisuan.com/en/tile-quantity