算BuildCalc

Triangle Area Calculator

Area from three sides, with angles, inradius and circumradius.

Quick answer

With the default inputs: Side a 3 · Side b 4 · Side c 5Triangle area 6.0000 m²

Edit the inputs below to recalculate.
Side a mSide b mSide c m
The three sides must satisfy a + b > c, otherwise no triangle exists. Once the sides are fixed the area is unique (Heron), so there is no second solution.

Inputs

Result

Triangle area
6.0000m²
Perimeter12.000m
Semi-perimeter6.000m
Angle A (opposite a)36.87°
Angle B (opposite b)53.13°
Angle C (opposite c)90.00°
TypeRight-angled
Inradius1.0000m
Circumradius2.5000m
Height on a4.0000m
Height on b3.0000m
Height on c2.4000m

Heron needs the triangle inequality to hold — any two sides must exceed the third, otherwise the area is zero. On site, base × height ÷ 2 is more common because the height can be taped; the three-side method suits irregular plots where the height is inaccessible.

Formula

HeronA = √(s(s−a)(s−b)(s−c))
Semi-perimeters = (a + b + c) ÷ 2
Cosine rulecos A = (b² + c² − a²) ÷ 2bc
Inradiusr = A ÷ s
CircumradiusR = abc ÷ 4A
Height on aha = 2A ÷ a
Sides of 3, 4 and 5 m: semi-perimeter 6.000 m, area 6.0000 m², angles of 36.87°, 53.13° and 90.00°, a right-angled triangle, inradius 1.0000 m, circumradius 2.5000 m and a height of 2.4000 m on side c.

How to work it out

  1. First check that the three sides form a triangle: any two must sum to more than the third. Sides 3, 4 and 8 do not, so the tool flags an error or returns nothing meaningful.
  2. Compute the semi-perimeter s = (a + b + c) ÷ 2.
  3. Apply Heron's formula A = √(s(s−a)(s−b)(s−c)). Given three sides, this is the only route that needs no height.
  4. Find the angles by the cosine rule: cos A = (b² + c² − a²) ÷ (2bc), then take the inverse cosine. The three angles must sum to 180°, which is the built-in check.
  5. Inradius r = A ÷ s, circumradius R = abc ÷ (4A). Both are useful for circular components and irregular columns.
  6. Height on side a is ha = 2A ÷ a, needed for triangular roof frames, trusses and diagonal bracing lengths.

Where it goes wrong

Material and cost

Triangles appear in roof frames, trusses, bracing, irregular plots and triangular canopies. Formwork for irregular concrete members is measured on developed area and costs 40-80% more than regular work, with higher labour too.

On site

Basis

FAQ

With only three side lengths, how do I set out the angles?
Use the 3-4-5 method or the cosine rule. 3-4-5 is the practical squareness check: measure 3 m along one leg and 4 m along the other, and if the diagonal reads 5 m the corner is square — within 2 mm is plenty for building work. For other angles compute the third side and strike it from two tapes.
When does Heron's formula lose accuracy?
On slender triangles where one side approaches the sum of the other two, because s−c becomes a difference of two large similar numbers and most significant digits are lost. For such shapes on site, use base × height ÷ 2 or coordinates — both are far more stable.
What use are inradius and circumradius on site?
The inradius sets the largest round object that fits inside a triangular area — how big a circular tank fits on a triangular plinth, for instance. The circumradius locates the centre through three columns that are not collinear, which is more accurate on a triangular plot than bisecting diagonals.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Triangle Area Calculator. 2026-10-25. https://jianzhujisuan.com/en/triangle-area

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.