算BuildCalc

Angle Converter

Degrees, minutes, radians and slope percent, all at once.

Quick answer

With the default inputs: Value 30 · From unit DegreeDegrees 30°

Edit the inputs below to recalculate.

Inputs

Result

Degrees
30°
Degrees minutes seconds30° 0′ 0″
Minutes1800′
Seconds108000″
Radians0.523599rad
Gradians33.3333gon
Slope57.735%
Slope ratio1 : 1.73
Rise per metre577.4mm
Sine / cosine0.5 / 0.866

Slope percent is tangent times 100, not the angle: 45° is 100%, 30° is 57.7% and 5° is 8.75%. Trade talk of “a 2% fall” means the percentage. Beyond 90° the tangent goes negative and slope percent stops being meaningful.

Formula

Degrees1° = 60′ = 3600″
Radians180° = π rad, 1 rad = 57.2958°
Gradians90° = 100 gon, 1 gon = 0.9°
Slope percenti = tan(θ) × 100%
Slope ratio1 : n where n = 1 ÷ tan(θ)
Rise per metreh = tan(θ) × 1000 mm
30° is 1800′ or 108000″ — 0.5236 rad, 33.33 gon, a 57.735% slope or about 1:1.73, rising 577.4 mm per metre. The usual 2% flat-roof fall is 1.1458°.

Degrees, minutes, seconds and radians

DegreesMinutesSecondsRadiansGradians
1°60′3600″0.0174531.111
15°900′54000″0.26179916.667
30°1800′108000″0.52359933.333
45°2700′162000″0.78539850.000
60°3600′216000″1.04719866.667
90°5400′324000″1.570796100.000
180°10800′648000″3.141593200.000

How to work it out

  1. Degrees, minutes, seconds: 1° = 60′ = 3600″. Setting out uses this form, but 30°15′30″ must become 30.2583° before it goes into a trigonometric function.
  2. Radians: 180° = π rad, and 1 rad = 57.29578°. Spreadsheets and calculators take radians only, which is the most common trap in engineering calculation.
  3. Gradians: 90° = 100 gon, so 1 gon = 0.9°. Common on European surveying instruments, rare in China.
  4. Turns: 1 turn = 360° = 2π rad, occasionally used for rotation and speed.
  5. Gradient percentage: i = tan(θ) × 100%, the bridge between angle and slope for roofs, roads and drainage. Note it is tan, not sin — they converge at small angles and diverge sharply at large ones.
  6. Rise per metre: h = tan(θ) × 1000 mm. At 30° that is 577 mm per metre, the figure used for batten spacing on pitched roofs.

Where it goes wrong

Material and cost

An angle error in setting out means rework: writing 30.15° for 30.25° shifts 175 mm over 100 m, enough that steelwork or curtain walling will not fit. On roofs, one degree of pitch error changes tile quantity by 1-2% per 100 m².

On site

Basis

FAQ

Are slope and angle different things?
Yes. An angle is the opening between two lines; a slope is rise over run, and tangent links them. They are close at small angles (5° is 8.75%, only 3.75 points apart) but diverge fast (30° is 57.7%). Roof “fractions of fall” and road percentages are both slopes.
Why angles for bar bending but slopes for formwork?
Bar scheduling cares about the bend, and codes specify 90° or 135° hooks that map straight onto the bender's scale. Formwork and roofs care about drainage, which depends on rise relative to run, so a slope is used. They are not interchangeable — treating 2% as 2° overstates the fall by 14%.
Why is the radian dimensionless?
Because a radian is arc length divided by radius — length over length, so the units cancel. Angular velocity is therefore per second rather than radian per second, and inertia times angular acceleration gives torque with no conversion factor, which is why physics needs radians and degrees would introduce a stray π/180.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Angle Converter. 2026-10-25. https://jianzhujisuan.com/en/unit-angle

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.