算BuildCalc

Area Unit Converter

Square metres, hectares, mu and square feet — all units at once.

Quick answer

With the default inputs: Value 1 · From unit Square metre · To unit MuConverted value 0.0015 mu

Edit the inputs below to recalculate.

Inputs

Result

Converted value
0.0015mu
Square metre1m²
Square millimetre1000000.00mm²
Square centimetre10000.00cm²
Square kilometre0.000001km²
Hectare0.0001ha
Mu0.0015mu
Square foot10.7639ft²
Square inch1550.00in²
Square yard1.196yd²
Acre0.000247ac

Mu, hectares and acres are still widely used for land transactions; title documents usually state both square metres and mu.

Formula

Metric1 m² = 10 000 cm² = 1 000 000 mm²
Land1 ha = 10 000 m² = 15 mu, 1 mu = 666.67 m²
Imperial1 ft² = 144 in² = 0.092903 m², 1 yd² = 9 ft²
Acre1 acre = 4 840 yd² = 4 046.86 m² ≈ 6.07 mu
General ruletarget = source value × source factor ÷ target factor
One mu is 666.6667 m², roughly one and a half basketball courts; one hectare is 15 mu. A 100 m² apartment floor area is about 0.15 mu.

Area and land unit reference

UnitSymbolIn m²In muTypical use
Square metrem²10.0015Floor area
Hectareha1000015Site area
Mumu666.671Farmland, land transfer
Square kilometrekm²10000001500Regional area
Square footft²0.09290.000139Imported plant footprint
Square yardyd²0.83610.00125Carpet, fabric
Acreacre4046.866.07Overseas farms

How to work it out

  1. Within metric: 1 m² = 10,000 cm² = 1,000,000 mm², and 1 km² = 1,000,000 m². Area scales as the square of length, so the steps are 100 and a million, not 10 and a thousand.
  2. For land, anchor on one relationship: 1 hectare = 10,000 m² = 15 mu, so 1 mu = 666.67 m². This is the workhorse conversion for Chinese land and compensation work.
  3. Imperial: 1 ft² = 144 in² = 0.092903 m², and 1 yd² = 9 ft² = 0.836127 m². Imperial drawings are often in ft², and estate agents quote sq ft.
  4. Acre: 1 acre = 4840 yd² = 4046.86 m², about 6.07 mu. Overseas farm and plot areas use acres, which do not map directly onto the Chinese mu.
  5. General form: target = source × source factor ÷ target factor, where each factor is how many square metres one unit represents.
  6. Check the magnitude: 100 m² is about 1076 ft² and about 0.15 mu. A wrong order of magnitude means a wrong factor.

Where it goes wrong

Material and cost

An area unit error shifts the answer by one or two orders of magnitude. At 3000 CNY/m², reading 100 m² as 1000 m² mis-states a quote by 2.7 million. In compensation priced by the mu, reversing hectares and mu is a factor of tens.

On site

Basis

FAQ

Why is one mu such an odd 666.67 square metres?
Because mu comes from the Chinese system where the chi is 1/3 m. One mu is 60 square zhang = 6000 square chi, and one square chi is 1/9 m², so 1 mu = 6000 ÷ 9 = 666.67 m². Remember just two numbers on site: 1 mu ≈ 667 m², 1 hectare = 15 mu.
How do gross, internal and usable floor area differ?
Gross floor area is measured to the outside face of the external walls and includes walls and shared circulation; internal area is what the party walls enclose within your door; usable area subtracts the walls themselves. There is no fixed ratio — the gap between them runs 15-25% between units in the same building, so multiplying by 0.8 is not valid.
Can roof area be taken from floor area?
No. Flat roofs still add eaves, parapet inner faces and falls; pitched roofs must be increased by the slope factor — 1/cos30° = 1.155 at 30°, so projected area times 1.155. With dormers and rooflights the true developed area often exceeds the projection by over 20%.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Area Unit Converter. 2026-10-25. https://jianzhujisuan.com/en/unit-area

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.