算BuildCalc

Flow Rate Converter

m³/h, L/s, L/min and GPM — every unit at once.

Quick answer

With the default inputs: Value 10 · From unit Cubic metre per hour · To unit Litre per secondConverted value 2.7778 L/s

Edit the inputs below to recalculate.

Inputs

Result

Converted value
2.7778L/s
Cubic metre per hour10m³/h
Cubic metre per second0.002778m³/s
Litre per second2.7778L/s
Litre per minute166.6667L/min
Litre per hour10000.00L/h
US gallon per minute44.0286GPM
US gallon per hour2641.72GPH
Cubic foot per minute5.8858CFM

Conversions use the US gallon (3.785 L). Imperial gallon flows are 20% larger; always confirm on imported equipment.

Formula

Base1 m³/h = 1000 L/h = 0.2778 L/s
Per second1 L/s = 60 L/min = 3.6 m³/h
US units1 GPM = 3.785 L/min = 0.2271 m³/h
Air1 CFM = 1.699 m³/h
Pipe sizingQ = A × v with A = πd²/4
10 m³/h is 2.778 L/s, 166.67 L/min, 44.03 GPM or 5.886 CFM. A DN50 pipe at 1.5 m/s carries about 10.6 m³/h — the same order.

Flow rate unit reference

UnitSymbolIn m³/hIn L/sTypical use
Cubic metre per hourm³/h10.2778Pumps, cooling towers
Cubic metre per secondm³/s36001000Rivers, large flows
Litre per secondL/s3.61Supply design
Litre per minuteL/min0.060.01667Terminal use
US gallon per minuteGPM0.22710.0631Imported equipment
Cubic foot per minuteCFM1.6990.4719Ventilation, fans

How to work it out

  1. Separate volumetric from mass flow first. m³/h and L/s are volumetric; t/h is mass, linked by density (water at 1 t/m³). Pump and fan data sheets use volumetric flow.
  2. Metric backbone: 1 m³/h = 1000 L/h = 0.2778 L/s, and conversely 1 L/s = 3.6 m³/h = 60 L/min. That 3.6 is the most-used factor in plumbing calculation.
  3. Imperial: 1 GPM (US gallon per minute) = 3.785 L/min = 0.2271 m³/h, and 1 GPH is GPM × 60. Imported pumps and fire equipment are rated in GPM.
  4. Airflow: 1 CFM = 1.699 m³/h = 0.4719 L/s. Air conditioning, cleanrooms and imported fans are often rated in CFM.
  5. Sizing the pipe: Q = A × v with A = πd²/4, so flow and velocity give the bore, and bore and velocity give the flow. Convert to m³/s before substituting — a unit slip here is a factor of 3600.
  6. Check: 10 m³/h is about 2.78 L/s or 44 GPM. A wrong order means the wrong system.

Where it goes wrong

Material and cost

Flow unit errors are order-of-magnitude errors in pump and pipe selection. A 10 m³/h duty read as 10 L/s buys equipment 3.6 times too large — tens of thousands wasted and permanently inefficient running. The reverse leaves the system short of flow, and in fire systems that simply fails acceptance.

On site

Basis

FAQ

Why do pumps come in m³/h when pipes are sized in L/s?
Different habits: pump makers rate hourly output while hydraulic tables are per second, a factor of 3.6. Convert everything to L/s before reading tables, or 10 m³/h gets mistaken for 10 L/s and the pipe comes out 2.7 times too big.
What is an economic water velocity?
Usually 1.0-1.5 m/s, 0.6-1.0 below DN50 and 1.2-2.0 above DN100. Too slow and sediment settles with long stagnation; too fast and head loss grows with the square of velocity, bringing noise and erosion. Fire mains may run to 2.5 m/s.
How do I convert GPM to m³/h quickly?
Multiply by 0.227, or roughly 0.23; the other way, 1 m³/h ≈ 4.4 GPM. Imported pumps and cooling towers rate flow in GPM while domestic fittings are chosen in m³/h, and a conversion slip shows up as insufficient cooling water and high-temperature alarms.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Flow Rate Converter. 2026-10-25. https://jianzhujisuan.com/en/unit-flow

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.