Force Unit Converter

kN, N, tonne-force, kgf and lbf for loads and lifting.

Quick answer

With the default inputs: Value 1 · From unit Kilonewton · To unit Tonne-forceConverted value 0.101972 tf

Edit the inputs below to recalculate.

Inputs

Result

Converted value
0.101972tf
Kilonewton1kN
Newton1000.00N
Meganewton0.001MN
Dekanewton100daN
Kilogram-force101.9716kgf
Tonne-force0.101972tf
Pound-force224.809lbf
Kip0.224809kip

Conversions use standard gravity, 9.80665 m/s², matching code values. Selection of lifting and support components must be checked by a qualified engineer.

Formula

Base1 kN = 1000 N, 1 MN = 1000 kN
Gravity1 kgf = 9.80665 N, 1 tf = 9.80665 kN
Anglo-American1 lbf = 4.44822 N, 1 kip = 1000 lbf = 4.44822 kN
Mass and force1 t of mass produces 9.80665 kN of weight
Site ruleTake 1 t ≈ 10 kN, a 2% overestimate
One tonne-force is 9.80665 kN, 1000 kgf or 2204.62 lbf. A sling rated 50 kN is about 5.1 tf; with a safety factor of 6 each leg may lift 0.85 t.

Force and load unit reference

UnitSymbolIn kNIn tonne-forceTypical use
KilonewtonkN10.102Structural loads
NewtonN0.0010.000102Small members
DekanewtondaN0.010.00102European marking
Tonne-forcetf9.806651Lifting weights
Kilogram-forcekgf0.0098070.001Old codes
Kipkip4.448220.4536US structures
Pound-forcelbf0.0044480.000454US customary

How to work it out

  1. Separate force from mass first. kN is force; kg and t are mass, related through g = 9.80665 m/s², so one tonne of mass produces 9.80665 kN of weight.
  2. Basic relations: 1 kN = 1000 N, 1 MN = 1000 kN, 1 daN = 10 N (daN is common in European documentation).
  3. Gravitational units: 1 kgf = 9.80665 N and 1 tf = 9.80665 kN. Old drawings use tonnes-force, numerically close to metric tonnes but conceptually different.
  4. Anglo-American: 1 lbf = 4.44822 N and 1 kip = 1000 lbf = 4.44822 kN. US structural drawings use kip and kip/ft for loads.
  5. Field approximation: 1 t ≈ 10 kN, within 2%. Lifting, scaffolding and falsework estimates all use it — accurate enough and easy to remember.
  6. Check: 100 kN is about 10.2 tf or 22.5 kip. A wrong order means the wrong force unit.

Where it goes wrong

Material and cost

In lifting and propping a force unit error is a safety incident. Reading a 10 t (98 kN) crane limit as 10 kN invites a tenfold overload and a collapse, and the same applies to scaffold and falsework capacity checks.

On site

Basis

FAQ

Why are loads in kN rather than kg?
The kilogram measures mass and the kilonewton measures force, and structures respond to force. The same one-tonne machine weighs 9.8 kN on Earth and 1.6 kN on the Moon. A code live load of 2.0 kN/m² is a force, about 204 kg/m² of mass — which is where the “200 kg per square metre” floor label comes from.
How do wire rope tonnages convert to kN?
Multiply by 9.80665. A rope rated 10 t has a breaking force near 98 kN; divide by the safety factor for working load — 6 for lifting, 14 for man-riding. Check whether the maker quotes breaking force or working load, because they differ sixfold and getting it wrong kills people.
How heavy is 1 kN really?
About 102 kg — one adult, or two bags of cement. On site, allow roughly 1 kN per 100 kg: a 6 m length of 25 mm bar is 23 kg or 0.23 kN, and a 1 m² plate 10 mm thick is 78.5 kg or 0.77 kN.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Force Unit Converter. 2026-10-25. https://jianzhujisuan.com/en/unit-force

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.