Power and Heat Converter

kW, horsepower, kcal/h, BTU/h and tons of refrigeration.

Quick answer

With the default inputs: Value 1 · From unit Kilowatt · To unit Metric horsepowerConverted value 1.3596 PS

Edit the inputs below to recalculate.

Inputs

Result

Converted value
1.3596PS
Kilowatt1kW
Watt1000.00W
Megawatt0.001MW
Mechanical horsepower1.341hp
Metric horsepower1.3596PS
Kilocalorie per hour859.8452kcal/h
BTU per hour3412.14BTU/h
Ton of refrigeration0.284345RT
Foot-pound per second737.561ft·lb/s

Conversions use 1 kcal = 4.1868 kJ and 1 BTU = 1.05506 kJ. Cooling capacity must come from a load calculation, not area times a rule of thumb.

Formula

Base1 kW = 1000 W, 1 MW = 1000 kW
Horsepower1 hp = 0.7457 kW, 1 PS = 0.7355 kW
Heat1 kcal/h = 1.163 W, 1 kW = 860 kcal/h
Anglo-American heat1 BTU/h = 0.2931 W
Cooling1 RT = 3.5169 kW = 3024 kcal/h = 12000 BTU/h
Energy1 kWh = 860 kcal = 3412 BTU
1 kW is 1.3596 hp, 860 kcal/h, 3412.14 BTU/h or 0.2843 RT. A 5 PS (3.675 kW) air conditioner is about 1.05 refrigeration tons.

Air conditioner rating and cooling capacity

Horsepower (PS)Input kWCooling kWCooling kcal/hTypical area m²
1 PS0.7352.50215010-15
1.5 PS1.1033.50301015-22
2 PS1.4715.00430022-30
3 PS2.2057.20619030-45
5 PS3.67512.001032050-70

How to work it out

  1. Separate electrical power from cooling or heating capacity first. kW can mean either, so confirm whether a data sheet quotes input power or output capacity — it changes how efficiency is calculated.
  2. Basic relations: 1 kW = 1000 W and 1 MW = 1000 kW. Electrical power is the simplest conversion here.
  3. Two kinds of horsepower: 1 mechanical horsepower (hp) = 0.7457 kW, and 1 metric horsepower (PS) = 0.7355 kW — 1.4% apart, with imported and domestic equipment using different conventions.
  4. Heat: 1 kcal/h = 1.163 W and 1 kW = 860 kcal/h; 1 BTU/h = 0.2931 W and 1 kW = 3412 BTU/h. These are the core conversions in HVAC and refrigeration.
  5. Cooling: 1 refrigeration ton (US) = 3.5169 kW = 3024 kcal/h = 12,000 BTU/h. A Japanese ton of refrigeration is 3.861 kW, 9.8% larger, and appears occasionally in Japanese data.
  6. The electricity-heat bridge: 1 kWh = 860 kcal = 3412 BTU, valid only where electricity converts wholly to heat. It does not apply to heat pumps with a COP above 1.

Where it goes wrong

Material and cost

Power unit errors drive both equipment selection and running cost. Reading a 100 kW chiller as 28 refrigeration tons mis-selects the machine by hundreds of thousands; misjudging connected load distorts the annual electricity estimate by tens of thousands; and in a capacity application to the utility it causes either rejection or wasted capacity.

On site

Basis

FAQ

Is an air conditioner's “horsepower” power or cooling?
Strictly it is input power, 735.5 W per PS, but in shops “1 hp” means about 2500 W of cooling because the efficiency ratio is around 3.4. That is why two nominally identical units differ by 20% in capacity. Always size on the nameplate cooling capacity in kW, not the horsepower.
Why do mechanical and metric horsepower differ?
Mechanical horsepower is 550 ft·lb per second (745.7 W) and metric horsepower is 75 kgf·m per second (735.5 W), 1.4% apart. European equipment uses PS and American uses hp, so on a large motor 1.4% is a whole kilowatt — allow headroom when sizing drives.
Why is one refrigeration ton 3.5 kW?
It comes from ice melting: one US ton of refrigeration is the power to melt one short ton (907 kg) of ice at 0°C in 24 hours — 907 × 333.5 kJ ÷ 86400 s ≈ 3.5 kW. The Japanese ton uses 1000 kg and gives 3.86 kW, 10% more, so check imported units carefully.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Power and Heat Converter. 2026-10-25. https://jianzhujisuan.com/en/unit-power

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.