Temperature Converter

Celsius, Fahrenheit and Kelvin, with site temperature references.

Quick answer

With the default inputs: Temperature 20 · From unit CelsiusDegrees Celsius 20 °C

Edit the inputs below to recalculate.

Inputs

Result

Degrees Celsius
20°C
Degrees Fahrenheit68°F
Kelvin293.15K
Degrees Rankine527.67°R
Above freezing20K
State of waterLiquid
Concrete curingNormal curing
Asphalt placementSuitable

Celsius and Fahrenheit are linear but have different zeros, so they are not proportional: 0°C = 32°F, 100°C = 212°F, and a 1°C interval equals a 1.8°F interval. Kelvin starts at absolute zero, 0 K = −273.15°C, and is used in science rather than on site.

Formula

Celsius to Fahrenheit°F = °C × 1.8 + 32
Fahrenheit to Celsius°C = (°F − 32) ÷ 1.8
Celsius to KelvinK = °C + 273.15
Kelvin to Celsius°C = K − 273.15
Rankine°R = (°C + 273.15) × 1.8
IntervalsΔ1°C = Δ1.8°F — only differences scale
20°C is 68°F, 293.15 K or 527.67 °R. At 5°C concrete cures normally; at −2°C it needs insulating or heating, or the early frost damage permanently reduces strength.

Temperatures that matter on site

TemperatureSituationRequirement
0°CFreezing pointWater freezes; concrete needs frost protection
5°CWinter concretingWinter rules apply below 5°C for five consecutive days
10°CAsphalt placementNot normally placed below 10°C
20°CCube curingStandard curing at 20 ± 2°C
60°CSteam curing capUsually not above 60°C to avoid strength regression
100°CBoiling pointWater boils at atmospheric pressure

How to work it out

  1. Distinguish a temperature from a temperature difference first. 20°C is a point on the scale; a 20°C difference is a different quantity, and the two convert differently. This is the central distinction in temperature conversion.
  2. Celsius to Fahrenheit (points): ℉ = ℃ × 1.8 + 32, and ℃ = (℉ − 32) ÷ 1.8. So 20°C is 68°F, 100°C is 212°F and 0°C is 32°F.
  3. Celsius to kelvin (points): K = ℃ + 273.15 and ℃ = K − 273.15. Absolute zero is 0 K = −273.15°C.
  4. Differences scale without offset: Δ1°C = Δ1.8°F and Δ1 K = Δ1°C. A 20°C difference is a 36°F difference. Conductivity and expansion coefficients use differences.
  5. Rankine: °R = (℃ + 273.15) × 1.8, the absolute scale on the Fahrenheit interval, occasionally seen in Anglo-American thermal data.
  6. Useful reference points: concrete standard curing 20±2°C, winter concreting threshold 5°C, asphalt mixing 150-165°C, hot-water heating 75/50°C flow and return.

Where it goes wrong

Material and cost

A temperature error in concrete is a quality failure: without antifreeze admixture or adequate protection, frozen young concrete loses 30-50% of its strength permanently and must be broken out. In HVAC it is an energy problem — a doubled temperature difference doubles the plant and radiator sizes in the wrong direction.

On site

Basis

FAQ

Why can't Celsius be doubled to get Fahrenheit?
Because the zeros differ: 0°C is 32°F, not 0°F, so the offset must be applied before scaling. The “double and add 30” shortcut is only a rough estimate — 2°C out near 20°C but 12°C out near 100°C, useless for measuring asphalt or concrete temperature.
What temperature triggers winter concreting rules?
Winter rules apply when the daily mean stays below 5°C for five consecutive days. Then thermal blankets, heated enclosures or antifreeze admixtures are required, with placing temperature not below 5°C (2°C for mass concrete). The earlier and colder the freeze, the greater and more permanent the strength loss.
Kelvin and Celsius differ by a constant, so why keep both?
Kelvin starts at absolute zero, which physics formulas such as the ideal gas law and radiation laws require, otherwise negatives break the equations. Celsius puts zero at the freezing point of water, which suits daily use, and site work, material standards and codes all use it. The conversion is simply 273.15.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Temperature Converter. 2026-10-25. https://jianzhujisuan.com/en/unit-temperature

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.