算BuildCalc

Volume Unit Converter

Cubic metres, litres, gallons and cubic feet — all units at once.

Quick answer

With the default inputs: Value 1 · From unit Cubic metre · To unit LitreConverted value 1000.00 L

Edit the inputs below to recalculate.

Inputs

Result

Converted value
1000.00L
Cubic metre1m³
Litre1000.00L
Millilitre (cm³)1000000.00mL
Cubic foot35.3147ft³
Cubic inch61023.61in³
Cubic yard1.308yd³
US gallon264.1722US gal
UK gallon219.9692UK gal
Oil barrel6.2898bbl

Metric and imperial liquid measures are not interchangeable. Engineering quantities use cubic metres and litres; gallons and barrels appear only in equipment data and shipping documents.

Formula

Metric1 m³ = 1000 L, 1 L = 1000 mL = 1000 cm³
Imperial1 ft³ = 1728 in³ = 0.0283168 m³, 1 yd³ = 27 ft³
Gallons1 US gal = 3.78541 L, 1 UK gal = 4.54609 L
Barrel1 bbl = 42 US gal = 158.987 L
Site numbers1 m³ of concrete ≈ 2.4 t, 1 m³ of water = 1 t = 1000 L
One cubic metre is 1000 litres or 35.3147 cubic feet; a full 8 m³ mixer truck holds about 211.9 US gallons.

Volume unit reference

UnitSymbolIn m³In litresTypical use
Cubic metrem³11000Concrete, earthwork
LitreL0.0011Paint, oil
Cubic footft³0.0283228.32Imported plant
Cubic yardyd³0.7646764.6Overseas earthwork
US gallonUS gal0.0037853.785Imported pumps
UK gallonUK gal0.0045464.546British equipment
Oil barrelbbl0.15899158.99Oil measurement

How to work it out

  1. Within metric: 1 m³ = 1000 L, 1 L = 1000 mL = 1000 cm³. Volume steps by 1000, unlike the 10 of length.
  2. Imperial volume: 1 ft³ = 1728 in³ = 0.0283168 m³ (1728 being 12³), and 1 yd³ = 27 ft³ = 0.764555 m³ (27 being 3³).
  3. Gallons come in two kinds, which is where errors concentrate: 1 US gallon = 3.78541 L and 1 UK gallon = 4.54609 L — a 20% difference.
  4. Oil barrel: 1 bbl = 42 US gallons = 158.987 L, about 0.159 m³. In the oil trade the barrel is a volume, not a weight.
  5. Practical construction equivalents: 1 m³ of water = 1 t = 1000 L; concrete about 2.4 t; sand about 1.5 t; crushed stone 1.5-1.6 t.
  6. Check the magnitude: 1 m³ is about 264 US gallons or 35.3 ft³. A wrong order means the wrong gallon system.

Where it goes wrong

Material and cost

Volume errors translate directly into money. One hundred cubic metres of C30 at 490 CNY/m³ is 49,000 CNY, and a 10% shortfall is 4,900 CNY plus the risk of an interrupted pour and a cold joint. Aggregate priced by tonne versus by cubic metre differs by about 50% if the basis is confused.

On site

Basis

FAQ

Why are US and UK gallons different?
The US gallon derives from the wine gallon (231 in³ ≈ 3.785 L) and the UK gallon from the ale gallon (4.546 L), a 20% gap. On imported equipment labelled in gallons, confirm which one — treating US as UK overstates capacity by a fifth.
Why is a cubic metre of water exactly one tonne?
Water is 1000 kg/m³ at 4°C, so engineers simply take 1 t/m³. That only holds for water: concrete is 2.4 t/m³, sand 1.5, gravel 1.5, steel 7.85. Mixing volume and weight when planning haulage is the commonest cause of overloaded trucks.
Are capacity and volume the same thing?
Numerically yes, in use no. Volume is the space an object occupies; capacity is what a container holds, measured inside. A 1 × 1 × 1 m tank with 100 mm walls has 1 m³ of volume but only 0.8 × 0.8 × 0.8 = 0.512 m³ of capacity — half of it.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Volume Unit Converter. 2026-10-25. https://jianzhujisuan.com/en/unit-volume

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.