Weight Unit Converter

Tonnes, kilograms, jin and pounds — every unit at once.

Quick answer

With the default inputs: Value 1 · From unit Tonne · To unit KilogramConverted value 1000.00 kg

Edit the inputs below to recalculate.

Inputs

Result

Converted value
1000.00kg
Kilogram1000.00kg
Gram1000000.00g
Tonne1t
Jin2000.00jin
Liang20000.00liang
Pound2204.62lb
Ounce35273.99oz
Long ton0.984204long tn
Short ton1.1023short tn
Quintal10q

Engineering quantities use kilograms and tonnes. Chinese units such as jin and liang appear only in small trades and never in structural or settlement documents.

Formula

Metric1 t = 1000 kg = 1 000 000 g, 1 q = 100 kg
Chinese1 jin = 500 g, 1 liang = 50 g, 10 liang to a jin
Imperial1 lb = 16 oz = 0.453592 kg
Three tonsmetric 1000 kg, long 1016.05 kg, short 907.18 kg
Densitiesconcrete 2.4 t/m³, sand and gravel 1.5 t/m³, steel 7.85 t/m³
1000 kg is 1 tonne, 2000 jin or 2204.62 lb. A 30 t load of gravel is about 20 m³ at 1.5 t/m³ — plan loads by weight, not by volume.

Material densities and mass per cubic metre

MaterialDensityMass per m³Note
Water1000 kg/m³1.00 tAt 4°C
Plain concrete2400 kg/m³2.40 tC20-C40
Reinforced concrete2500 kg/m³2.50 t100-200 kg/m³ of steel
Cement mortar2000 kg/m³2.00 t1:3 mix
Medium sand (loose)1500 kg/m³1.50 tDry
Crushed stone (loose)1500 kg/m³1.50 t5-25 mm
Clay brick1800 kg/m³1.80 t240×115×53
Steel7850 kg/m³7.85 tCarbon steel
Pine (air dry)500 kg/m³0.50 t12-15% moisture
AAC600 kg/m³0.60 tGrade B06

How to work it out

  1. Metric: 1 t = 1000 kg = 1,000,000 g, and 1 quintal (q) = 100 kg. Steel, cement and aggregate are traded by the tonne in construction.
  2. Chinese municipal units: 1 jin = 500 g, 1 liang = 50 g, ten liang to the jin. Markets and legacy material lists use these, and 1 tonne is 2000 jin.
  3. Imperial: 1 lb = 16 oz = 0.453592 kg, and 1 oz = 28.3495 g. Imperial drawings sometimes give reinforcement rates and loads in lb and psf.
  4. Three tonnes must be distinguished: the metric tonne at 1000 kg, the long ton at 1016.05 kg, and the short ton at 907.18 kg — roughly 10% apart, the classic trap in imported equipment and scrap pricing.
  5. Densities worth knowing: concrete 2.4 t/m³ (reinforced 2.5), sand 1.5, crushed stone 1.5-1.6, steel 7.85, water 1.0, loose cement 1.3, lime 1.2.
  6. Check: 1 t is about 2205 lb, and 1 jin is 0.5 kg. A wrong order means the wrong ton.

Where it goes wrong

Material and cost

Steel trades by the tonne at around 4200 CNY, so on a 1000 t project a metric-versus-short-ton confusion is 400,000 CNY. Aggregate priced by weight versus volume differs by about 50%, and that is the item most disputed at settlement.

On site

Basis

FAQ

Why is rebar settled by theoretical weight rather than on the scales?
Bar diameters carry a permitted tolerance, so weighing lets negative tolerance cut the real steel area. The standard fixes theoretical mass by nominal diameter (Φ20 = 2.47 kg/m) and settlement uses mass × length. “Non-standard” bar can weigh correctly while being undersized, losing over 10% of capacity.
Is the jin still used in construction?
For sundries and small hardware markets — nails, wire, welding rod — quotes still come by the jin at 500 g, a factor of two from the kilogram, which invites confusion. Contracts and settlements must be in kilograms or tonnes; where a verbal quote is by jin, write the converted mass on the document.
How far apart are long and short tons?
A long ton is 1016.05 kg, a short ton 907.18 kg — 12% apart. On imported equipment, confirm which “ton capacity” is meant; picking the wrong one overloads a crane or truck by 12%, which is a safety issue rather than a rounding error.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Weight Unit Converter. 2026-10-25. https://jianzhujisuan.com/en/unit-weight

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.