算BuildCalc

Construction VAT Calculator

Output tax, input credit, VAT payable and surcharges.

Inputs

CNY
%
9% construction, 3% simplified, 13% goods
CNY
%
7% urban + 3% education + 2% local = 12%

Result

Formula

Net amountgross ÷ (1 + rate)
Output taxgross − net
VAT payableoutput − input credit
Surchargespayable × surcharge rate
Total taxpayable + surcharges
Effective ratetotal tax ÷ net
One million gross at 9% with 50,000 of credits: 917431 net, 82569 output tax, 32569 payable, 3908 surcharges — 36477 in total, an effective rate of 3.98%.

FAQ

Why is the effective rate 4% when the nominal rate is 9%?
Because VAT taxes value added, not turnover — output tax less input credits is what you pay, and materials, plant and subcontracts all generate credits. The effective rate tracks how many invoices you collect: 80% coverage gives 2-4%, 40% gives over 6%. That is why paperwork is the heart of construction tax management.
What are surcharges based on?
On the VAT actually paid, not on revenue: 7% urban construction tax in city areas, 3% education surcharge and 2% local education surcharge — 12% in total. If a credit balance means no VAT is payable, there are no surcharges either. Small-scale taxpayers get a 50% reduction in many places, so check local policy.
When is the simplified method cheaper?
When credits cover less than about 30% of costs. Simplified charges 3% on the full amount with no credits; general charges 9% but allows them. Setting p as credits over output tax, 3% = 9% × (1 − p) gives p = 67% — so once credits fall below two thirds of output, simplified wins. Labour-only and client-supplied-material jobs usually qualify.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.