Wall Tile Count Calculator

Net area after openings to pieces and boxes.

Quick answer

With the default inputs: Wall perimeter 14 · Tiling height 2.4 · Total opening area 3.6 m² etc.Tiles incl. waste 180 pcs

Edit the inputs below to recalculate.
DeductWall perimeter mTiling height m
Perimeter is the internal girth and height stops at the ceiling. Openings are deducted whole, but external corners need about 5% cutting waste.

Inputs

m²
%
pcs

Result

Tiles incl. waste
180pcs
Gross wall area33.6m²
Net area after openings30.0m²
Area per tile0.180m²
Theoretical pieces166.7pcs
Pieces incl. waste180pcs
Boxes (whole)23boxes
Adhesive estimate150kg

Net area = perimeter × height − openings. Three cautions: window reveals and sills are usually tiled too and must be added; door openings are often not deducted because architraves cover them and deducting tends to undersupply; and waste runs 5-8% for straight lay, 12-15% for diagonal or herringbone and 10% for large format cuts. Never mix batches on one wall, and keep 2-3 spares.

Formula

Net area = perimeter × height − openings
Pieces = net area ÷ (tile length × width)
Count = ceil(pieces × (1+waste))
Boxes = ceil(count ÷ pieces per box)
Bathroom 14 m perimeter tiled to 2.4 m with 3.6 m² of openings, 300×600 tiles, 8% waste and 8 pieces per box: 33.6 m² gross, 30.0 m² net; 166.7 pieces theoretical, 180 with waste, 23 boxes, and about 150 kg of adhesive.

How to work it out

  1. Net area = wall perimeter × tiling height − opening area. Take the height from the design: 2.4 m in bathrooms, up to the ceiling in kitchens.
  2. The critical addition: the reveals of openings get tiled too, so add (opening perimeter × wall thickness) for each one. This is routinely missed and a single window reveal is 0.5-1 m².
  3. Divide the net area by the tile area for a theoretical count.
  4. Add 8-10% waste: wall tiling needs holes for pipes and boxes and mitred or trimmed external corners, so it wastes more than floors.
  5. Divide by tiles per box and round up. Borders and feature tiles are counted separately by length or piece.

Where it goes wrong

Material and cost

300×600 wall tile 25-60 CNY/m², 400×800 40-90. Labour 40-60 CNY/m², mitred corners add 15-25 per metre. Adhesive 8-15 CNY/m², trim 5-15 per metre.

On site

Basis

FAQ

Should openings be fully deducted?
Separately. A window with reveals and a sill is still tiled, so deduct only the clear opening; a door is covered by the architrave but the wall above and beside is still tiled, so deduct the leaf area or not at all. Where the opening does not align with the tile module, cutting around it produces more waste - raise the waste figure when deducting.
What is the difference between wall tile and floor tile?
Interior wall tiles (ceramic) have water absorption above 10% - light, easy to cut, cheap, but weak and frost sensitive, so interior walls only. Porcelain tiles absorb under 0.5%, are strong and abrasion resistant and suit floors and exteriors. Bathroom walls commonly use ceramic, floors must use porcelain. Using interior wall tile outdoors leads to frost spalling.
Why keep spares?
Repairs - a leaking pipe, a moved socket or a cracked tile during drilling all need matching tiles, and colours differ clearly between batches, so replacements are unobtainable years later. Cuts around openings and corners also overrun. Shipping breakage of large format runs 1-2%. Three to five spares is standard practice and cheap insurance.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Wall Tile Count Calculator. 2026-10-25. https://jianzhujisuan.com/en/wall-tile-count

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.