算BuildCalc

Wallpaper Roll Calculator

Drops and rolls from perimeter, height and pattern repeat.

Inputs

m
(length + width) × 2
m
m
m
m²

Result

Formula

Cut lengthL = wall height + pattern repeat (0.1 m trim if plain)
Drops per rolln = floor(roll length ÷ L)
Drops neededN = ceil(perimeter ÷ roll width)
RollsR = ceil(N ÷ n)
An 18 m perimeter at 2.8 m with 0.53 × 10 m rolls and no repeat: 2.90 m per drop, 3 drops per roll, 34 drops, so 12 rolls. At a 0.64 m repeat each drop is 3.44 m, only 2 fit per roll, and 17 rolls are needed.

FAQ

Why does a pattern repeat cost so much extra?
With a repeat every drop must start at the same point in the pattern: a 2.8 m wall plus a 0.64 m repeat is 3.44 m, so a 10 m roll yields two drops and leaves 3.12 m unusable. That is why large repeats waste so much. Calculate with this formula rather than dividing area, or you will run short.
Can I deduct doors and windows?
Rarely, because paper is hung in full drops: the strips above and below an opening are cut from a full drop and the offcut seldom matches elsewhere. You only save when a door runs full height or a window sits exactly between two drops. This tool shows net area but does not reduce the roll count.
How much adhesive?
About 1 kg of powder, once mixed, covers 20-25 m², or 0.3-0.4 kg per 5.3 m² roll. Primer is separate at roughly 8-10 m² per kg. Prime the wall first: adhesive soaked straight into the filler coat will fail in sheets later.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.