Cost Breakdown Totaliser
Six items into one total, with cost per m² and a missing-item check.
With the default inputs: Gross floor area 1000 m² · Concrete 168000 CNY · Rebar 253000 CNY etc.Total construction cost 214.00 10k CNY
Use your own dimensions ↓Inputs
Result
| Total in CNY | 2140000CNY |
| Cost per m² | 2140CNY/m² |
| Concrete share | 7.9% |
| Rebar share | 11.8% |
| Formwork share | 7.2% |
| Scaffolding share | 1.4% |
| Labour share | 24.3% |
| Other share | 47.4% |
| Items entered | 6 / 6 |
| Largest share | 47.4% |
How this is worked out
All six are filled in. This is still direct cost, before overheads, profit, levies and tax — put it through the unit-rate build-up before it goes out, and settlement comes last.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Total cost | concrete + rebar + formwork + scaffolding + other labour + other materials |
| Cost per m² | total ÷ gross floor area |
| Share of each item | item ÷ total × 100% |
| Source of each figure | the total from each tool, not the unit rate |
FAQ
Why does this not match the cost-per-m² estimator?
Should labour be a separate line?
Can this total be quoted directly?
What to calculate next
These jobs are done back to back on site — follow the steps to work through the whole sequence.
Preliminaries: scaffold against formworkStep 4 of 4
- 1Scaffolding Cost Calculator
- 2Formwork Cost Calculator
- 3Labour Cost Build-up Calculator
- 4Cost Breakdown Totaliser
Item costs: concrete and rebar into a totalStep 3 of 4
- 1Concrete Cost Calculator
- 2Rebar Cost Calculator
- 3Cost Breakdown Totaliser
- 4Unit Rate Build-up Calculator
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Cost Breakdown Totaliser. 2026-10-25. https://jianzhujisuan.com/en/cost-summary