Cost Breakdown Totaliser

Six items into one total, with cost per m² and a missing-item check.

Quick answer

With the default inputs: Gross floor area 1000 m² · Concrete 168000 CNY · Rebar 253000 CNY etc.Total construction cost 214.00 10k CNY

Use your own dimensions ↓

Inputs

m²
CNY
CNY
CNY
CNY
CNY
CNY

Result

Total construction cost
214.0010k CNY
Total in CNY2140000CNY
Cost per m²2140CNY/m²
Concrete share7.9%
Rebar share11.8%
Formwork share7.2%
Scaffolding share1.4%
Labour share24.3%
Other share47.4%
Items entered6 / 6
Largest share47.4%
How this is worked out

All six are filled in. This is still direct cost, before overheads, profit, levies and tax — put it through the unit-rate build-up before it goes out, and settlement comes last.

Formula

Total costconcrete + rebar + formwork + scaffolding + other labour + other materials
Cost per m²total ÷ gross floor area
Share of each itemitem ÷ total × 100%
Source of each figurethe total from each tool, not the unit rate
A 1000 m² frame house: 168000 concrete, 253000 rebar, 154000 formwork, 30000 scaffolding, 520000 other labour and 1015000 other materials. The six add to CNY 2,140,000 in all, at 2140 per m² — rebar 11.8% and other materials 47.4%.

FAQ

Why does this not match the cost-per-m² estimator?
They answer different questions. The estimator multiplies a benchmark rate for similar buildings by the floor area and returns a figure including levies and tax, for investment appraisal and scheme comparison. This page adds up the actual cost of each item as you entered it, and whether tax is included depends on what you typed. Normally direct cost plus overheads, profit, levies and tax lands near the benchmark. Ten to twenty percent apart is normal; a factor of two means one item is on the wrong basis.
Should labour be a separate line?
Check what the other pages already include. The concrete, rebar, formwork and scaffolding tools each already carry their own labour — pumping, fixing, erection and striking — so the other-labour line here covers only bricklaying, plastering and services installation. Entering the same labour twice inflates the total and hides it in the percentages. Decide the basis of each item before you fill anything in; this is where costing goes wrong most often.
Can this total be quoted directly?
No. It is direct cost; a quote still needs overheads, profit, levies and tax, which is the unit-rate build-up. Preliminaries, provisional sums and main-contractor attendance also sit outside the itemised costs. What the totaliser is good for is showing where the money goes and which share looks wrong — rebar above thirty percent usually means the steel content or the waste allowance is overstated.

What to calculate next

These jobs are done back to back on site — follow the steps to work through the whole sequence.

Preliminaries: scaffold against formworkStep 4 of 4

  1. 1Scaffolding Cost Calculator
  2. 2Formwork Cost Calculator
  3. 3Labour Cost Build-up Calculator
  4. 4Cost Breakdown Totaliser

Item costs: concrete and rebar into a totalStep 3 of 4

  1. 1Concrete Cost Calculator
  2. 2Rebar Cost Calculator
  3. 3Cost Breakdown Totaliser
  4. 4Unit Rate Build-up Calculator

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Cost Breakdown Totaliser. 2026-10-25. https://jianzhujisuan.com/en/cost-summary

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.