Cylinder Volume Calculator

Volume, capacity, surface areas and weight for any cylinder.

Quick answer

With the default inputs: Diameter 1 · Height 3Cylinder volume 2.356 m³

Edit the inputs below to recalculate.
Diameter mHeight m
Use internal diameter and height for capacity; switch to outside diameter only for concrete volume. The difference is the wall.

Inputs

Result

Cylinder volume
2.356m³
Radius0.500m
Base area0.7854m²
Lateral area9.425m²
Total surface area10.996m²
Capacity2356.2L
Weight full of water2.356t
Weight full of concrete5.655t
Internal formwork area9.425m²
Capacity per metre785.4L

Capacity needs the internal diameter; the external diameter gives the space occupied. Tanks and silos are measured inside, concrete columns outside. Cylinder formwork is the lateral area only — the ends are usually excluded, the base sitting on blinding and the top being open.

Formula

Radiusr = d ÷ 2
Base areaA = π r²
VolumeV = π r² h
Lateral areaA = π d h
Total areaA = π d h + 2π r²
CapacityV(L) = V(m³) × 1000
A 1 m diameter, 3 m high cylinder: 0.7854 m² base, 2.356 m³ volume, 9.425 m² lateral area, 10.996 m² total, 2356.2 L capacity and 2.356 t when full of water.

How to work it out

  1. Convert diameter to radius, then compute the base area A = π r².
  2. Volume V = π r² h, covering concrete columns, circular tanks and shaft linings.
  3. Lateral area = π d h. That is the formwork area for a circular column, which costs 30-50% more than a square one.
  4. Total surface area = π d h + 2π r², used for coatings, protection and insulation.
  5. Volume conversion: 1 m³ = 1000 L. Tank, silo and vessel capacities are often quoted in litres or tonnes, with water at 1 t/m³.
  6. Self weight = volume × density: concrete 2.4 t/m³ (reinforced 2.5), steel 7.85, water 1.0.

Where it goes wrong

Material and cost

Labour and formwork for circular work clearly exceed rectangular: circular column formwork 60-120 CNY/m², tank wall formwork 80-150, both 30-50% above square equivalents. Concrete price is unchanged, but placing and vibration are slower, adding about 20% to labour.

On site

Basis

FAQ

Why does my tank always hold less than calculated?
Three reasons: using the outside diameter — a tank 4 m outside with 200 mm walls is 3.6 m inside, 19% less volume; ignoring freeboard, since the water line sits 200-300 mm below the top; and ignoring internals such as columns, baffles and ladders. Use the bore, deduct freeboard, and the error falls under 2%.
Does a round or square column use less formwork?
For equal area, round uses less because the circle has the shortest perimeter. But curved panels cost over twice as much as flat ones and need bespoke hoops, so for small and medium sections square is cheaper overall. Round steel forms only pay on large diameters, piers and silos where the cost is amortised.
Can the cylinder formula be used for a conical stockpile?
No — a cone uses V = πr²h/3, one third of the cylinder for the same base and height. A natural sand or gravel pile is closer to a frustum with a flattened top, so use V = πh/3 × (R² + Rr + r²); treating it as a cone overstates by 10-20%.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Cylinder Volume Calculator. 2026-10-25. https://jianzhujisuan.com/en/cylinder-volume

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.