Lintel Load and Moment Calculator
Wall load above the opening, moment and steel estimate.
With the default inputs: Clear span 1.5 · Wall thickness 240 · Masonry density 19 kN/m³ etc.Mid-span moment 0.98 kN·m
Edit the inputs below to recalculate.Inputs
Result
| Effective wall height | 0.50m |
| Wall line load | 2.28kN/m |
| Self weight | 1.20kN/m |
| Total line load | 3.48kN/m |
| Support shear | 2.61kN |
| Effective depth h0 | 165mm |
| Estimated steel area | 18mm² |
| Bars (Φ12 / Φ14) | 0.2 / 0.1bars |
A lintel in masonry only carries the wall weight within a limited height - the masonry above arches over to the sides, so codes allow min(actual height, span/3) with a 45° spread. The moment uses a simply supported beam, ql²/8, with at least 240 mm bearing each end (and no less than the wall thickness). The steel area from M/(0.9·fy·h0) is a rough estimate that ignores the real compression block and minimum ratios - for scheme checks only. Formal design should use a precast lintel catalogue or a proper concrete calculation, and must consider any concentrated loads above.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Effective height = min(actual, span/3) | 45° spread |
| q = thickness × effective height × density + self weight | kN/m |
| M = q·l²/8, V = q·l/2 | simply supported |
| As ≈ M / (0.9·fy·h0) | rough estimate |
How to work it out
- Establish the wall height carried by the lintel: by 45° dispersion, take a third of the clear span or the actual height, whichever is less — only a triangular wedge above the opening is carried.
- Line load q = wall height × thickness × masonry unit weight (kN/m), plus 1.0-1.5 kN/m² for plaster and finishes.
- Moment M = q × L² ÷ 8 for a simply supported span L.
- Steel area As ≈ M ÷ (0.9 × h₀ × fy) with h₀ = depth − cover − d/2. This is a rough check; formal design follows the concrete code.
- Check shear too: V = q × L ÷ 2, adding stirrups or depth where capacity is short.
Where it goes wrong
- Taking the full wall height above the opening — 45° dispersion means the masonry arches over, so only the triangle is carried; the full height overstates load two to threefold and over-reinforces the lintel.
- Ignoring plaster and finishes — 40 mm both sides is about 0.8 kN/m², which is 15% of the load on a 1.5 m span.
- Mixing conventions between moment and reinforcement — use the clear span for moment and the effective depth for steel consistently, and check shear within the bearing length.
Material and cost
Precast lintels run 60-120 each by span (about 90 for 1.5 m); cast in situ costs 450 per m³ of concrete plus steel and formwork, roughly 120-180 per metre. Precast is quicker but fixed in size; in-situ is flexible but needs formwork.
On site
- Bearing length is at least 250 mm, or 300 mm in seismic work; add a concrete pad where masonry strength at the bearing is inadequate.
- Above 1.5 m clear span, or with concentrated loads, standard precast lintels do not apply — design and cast in situ.
- Where a lintel coincides with a ring beam, measure it as the ring beam and do not count both.
Basis
- GB 50003-2011 Code for design of masonry structures, Section 7.2 (lintels)
- GB 50011-2010 Code for seismic design of buildings, Section 7.3
- GB 50203-2011 Code for acceptance of masonry construction, Chapter 8
FAQ
Why count only 0.5 m of a 3 m wall?
How much bearing does a lintel need?
If the calculated steel is tiny, can it be omitted?