Sand and Gravel Tonnage Converter

Cubic metres to tonnes by bulk density, with truck loads.

Quick answer

With the default inputs: Volume 10 m³ · Material Medium sand · Payload per truck 30Mass 15.00 t

Edit the inputs below to recalculate.

Inputs

m³

Result

Mass
15.00t
Bulk density1.50t/m³
In kilograms15000kg
Truck loads1loads
Volume per full load20.00m³
Last load15.00t
Load factor50.0%
50 kg bags300bags

Bulk density is the loose state, unlike the apparent density of the stone itself at about 2.7 t/m³ — voids take up some 40% of the volume. That is why 1 m³ of gravel weighs 1.5 t rather than 2.7. Moisture matters: damp sand is 10-15% heavier than dry, which catches people out in the rainy season.

Formula

MassW = volume × bulk density
TrucksN = ceil(mass ÷ payload)
Volume per loadpayload ÷ bulk density
Typical valuessand 1.50, crushed stone 1.50, cobble 1.60
MoistureDamp sand is 10-15% heavier
Versus apparent densityBulk is 55-60% of apparent, the rest is voids
10 m³ of medium sand at 1.50 t/m³ is 15.00 t — one 30 t truck at 50% load, only half full; 30 m³ needs two loads.

How to work it out

  1. Establish whether the figure is bulk (loose) density or particle density. Aggregate is always traded on bulk density; the 2.65 g/cm³ particle density is the rock itself and cannot be used to convert volume.
  2. Typical bulk densities: medium sand 1.45-1.55 t/m³, coarse 1.55-1.65, fine 1.35-1.45, crushed stone 5-25 mm 1.40-1.50, gravel 1.60-1.80.
  3. Tonnes = volume × bulk density. Ten cubic metres of medium sand is about 15 t.
  4. Loads = tonnes ÷ payload, rounded up. Check the body volume too: a 30 t tipper holds 18-20 m³, so 10 m³ of sand half fills it and counting loads wastes trips.
  5. Moisture changes bulk density sharply: dry sand at 1.45 bulks and wets out at 1.8-2.0 t/m³, which matters at the weighbridge in the rainy season.

Where it goes wrong

Material and cost

Medium sand 100-180 CNY/m³ (70-120 CNY/t), crushed stone 90-160, gravel 120-200, manufactured sand 80-150. Haulage 15-40 CNY/m³ including loading.

On site

Basis

FAQ

Why is a cubic metre of gravel not 2.7 tonnes?
2.7 t/m³ is the density of the solid stone; a heap has 40-45% voids between particles, so the bulk density is around 1.5 t. Concrete mix proportions quote 1150 kg/m³ of gravel in the loose state, not solid — confusing the two puts material quantities out by 80%.
Does wet sand weigh more?
Yes, and it is the commonest way to lose money on deliveries. Dry sand bulks at 1.45-1.50; at 5-8% moisture the surface films separate the grains so it bulks up while gaining weight, measuring 1.6-1.7. Buy by volume and the supplier ships damp sand; buy by weight and you assumed dry — both go wrong.
How do I avoid overweight fines?
Dispatch by payload, not by volume. A nominal 30 t body often holds 20 m³, which is exactly 30 t of gravel level-full but 32-34 t of sand. Use this tool to fix the volume ceiling per load — 30 ÷ 1.5 = 20 m³ — load to that, and weigh at the gate. A fine plus re-handling wipes out the margin on the whole load.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Sand and Gravel Tonnage Converter. 2026-10-25. https://jianzhujisuan.com/en/sand-ton

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.