Section Properties Calculator
Inertia governs deflection, section modulus governs strength — they are not interchangeable.
Also known as section properties · moment of inertia · radius of gyration
With the default inputs: Section shape Rectangle b×h · Width b 200 mm · Depth h 400 mm etc.Second moment I 106667 cm⁴
Use your own dimensions ↓Inputs
Result
| Section type | Rectangle |
| Area A | 800.0cm² |
| Second moment I | 106667cm⁴ |
| Section modulus W | 5333cm³ |
| Plastic modulus Wpl | 8000cm³ |
| Radius of gyration r | 115.5mm |
| Mass per metre | 628.0kg/m |
| Shape factor | 1.50 |
How this is worked out
Second moment and section modulus are two numbers doing two jobs, and swapping them gives a wrong answer. Inertia, in cm⁴, governs stiffness — deflection, distortion, vibration. Section modulus, W = I/(h/2) in cm³, governs strength — how much moment the section takes. So “is this stiff enough” asks about I and “will this fail” asks about W. For a rectangle I goes with depth cubed and W with depth squared: 20% more depth adds 73% to I but only 44% to W, so deflection improves faster than bending. That is the point of an I-section — material moved away from the neutral axis gives two to three times the inertia of a rectangle of the same area, at the cost of a thin web prone to local buckling and poor minor-axis stiffness, often a tenth of the major axis. An I-beam therefore always needs a lateral stability check and a rectangle does not. The plastic modulus runs 12 to 15% above the elastic one for an I-section and 50% for a rectangle; that ratio is the shape factor, the plastic reserve.
Next up: Steel Beam Span Calculator · Fillet Weld Strength Calculator
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Rectangle | I = bh³/12, W = bh²/6 |
| Circular hollow | I = π(D⁴−d⁴)/64, d = D−2t |
| I-section | I = [bf·h³ − (bf−tw)(h−2tf)³]/12 |
| Section modulus | W = I/(h/2) |
| Radius of gyration | r = √(I/A) |
| Mass per metre | m = A·7850 (A in m²) |
Basis
- Second moment of area and section modulus are geometric definitions (I = ∫y² dA, W = I/ymax)
- The plastic modulus Wpl follows EN 1993-1-1 §6.2.5 for the section shapes covered
- No national code sets these values — they depend only on the shape
FAQ
What is the difference between inertia and section modulus?
Why is an I-section so efficient in bending?
Why is a hollow section the same in every direction?
What is the shape factor?
What to calculate next
These jobs are done back to back on site — follow the steps to work through the whole sequence.
Steel: span to connectionStep 2 of 4
- 1Steel Beam Span Calculator
- 2Section Properties Calculator
- 3Column Buckling Calculator
- 4Fillet Weld Strength Calculator
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Section Properties Calculator. 2026-10-25. https://jianzhujisuan.com/en/section-modulus