Seismic Base Shear Calculator
Estimate the period, get the coefficient, multiply by seismic weight.
Also known as base shear calculation · seismic lateral force · equivalent lateral force
With the default inputs: Structure height hn 20 m · Structural system Reinforced concrete frame · Design spectral SDS 1.0 g etc.Base shear V 1737 kN
Use your own dimensions ↓Inputs
Result
| System | RC frame |
| Ct / x | 0.0466 / 0.9 |
| Fundamental period T | 0.691s |
| Plateau corner TS | 0.600s |
| T / TS | 1.15 |
| Seismic coefficient Cs | 0.174 |
| Branch | descending |
| Minimum Cs | 0.044 |
| Coefficient used | 0.174 |
| Base shear | 1737kN |
| Base shear ratio | 0.174×W |
How this is worked out
The equivalent lateral force method treats the earthquake as a set of horizontal forces whose total is the base shear, V = Cs W. The core coefficient is not one expression but three: below the plateau corner TS = SD1/SDS it is SDS/(R/I); between TS and the long-period transition TL it becomes SD1/(T R/I) and decays with period; beyond TL it falls as SD1 TL/(T² R/I). SDS and SD1 are the short-period and 1 s design spectral accelerations from the hazard map and site class, R is the ductility of the system (a well-detailed frame gets a high R and therefore a lower shear because it dissipates energy by yielding), and I is importance, 1.25 to 1.5 for hospitals and schools. A high R means a cheaper structure but larger drift and more damage to non-structural elements; a low R is safe but expensive. That trade-off is the heart of seismic design and it is not a free choice — use the R your code assigns to the system. The period from Ct hn^x is a preliminary estimate only; measured periods are usually 20 to 40% longer because infill walls stiffen the frame. And a coefficient of 0.1 is not small: on a ten-storey building it means tens of tonnes of horizontal force per ground floor column, reversing direction many times, which is why seismic resistance comes from ductile detailing such as closed hoops at closer spacing rather than from bigger sections.
Next up: Wind Load Calculator · Snow Load Calculator
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Fundamental period | T = Ct·hn^x |
| RC frame | Ct = 0.0466, x = 0.9 |
| Steel frame | Ct = 0.0724, x = 0.8 |
| Shear wall | Ct = 0.0488, x = 0.75 |
| Response coefficient (T ≤ TS) | Cs = SDS/(R/I) |
| (TS < T ≤ TL) | Cs = SD1/(T·R/I) |
| (T > TL) | Cs = SD1·TL/(T²·R/I) |
| Plateau corner | TS = SD1/SDS |
| Minimum | Cs,min = 0.044·SDS·I ≥ 0.01 |
| Base shear | V = Cs·W |
Basis
The codes below are listed for comparison. This calculator returns ASCE 7-22 values only.
- Implemented: ASCE 7-22 (United States) - the values this calculator returns
- ASCE 7-22, §12.8.1.1 — seismic base shear V = Cs·W
- ASCE 7-22, §12.8.1.1 and Table 12.8-2 — approximate period Ta = Ct·hn^x
- ASCE 7-22, §12.8.2 — Cs in the plateau, the SD1/T branch and the TL branch
- ASCE 7-22, §12.8.3 — vertical distribution Fx = Cvx·V
FAQ
How do I calculate seismic base shear?
What value of R should I use?
What to calculate next
These jobs are done back to back on site — follow the steps to work through the whole sequence.
Structure: loads before membersStep 3 of 4
- 1Wind Load Calculator
- 2Snow Load Calculator
- 3Seismic Base Shear Calculator
- 4Punching Shear Calculator
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Seismic Base Shear Calculator. 2026-10-25. https://jianzhujisuan.com/en/seismic-base-shear