Circuit Load and Breaker Calculator

Design current, breaker loading and suggested ratings.

Quick answer

With the default inputs: Connected load 3000 W · Voltage 220 V · Power factor 0.9 etc.Design current 12.12 A

Edit the inputs below to recalculate.

Inputs

W
V
Sockets 0.7-0.9, lighting 0.9-1.0
A

Result

Design current
12.12A
Diversified load2400W
Diversity factor0.80
Breaker rating16A
Loading75.8%
VerdictLoading is sensible
Suggested breaker15A
Matching cable (conduit)1.5mm²
Spare capacity3.88A
Spare load768W

A breaker must satisfy two conditions at once: no larger than the cable capacity, so it protects the conductor, and at least 1.1-1.25 times the design current, so it does not nuisance trip. Sustained loading above 85% ages the device; below 40% short-circuit protection is insensitive; 60-80% is the sweet spot. Socket circuits need 30 mA residual current protection.

Formula

Diversified loadload × diversity
Design currentPc ÷ (U × cosφ)
Loadingcurrent ÷ breaker rating
Lower limit≥ 1.1 × current
Upper limit≤ cable capacity
Cablecapacity ≥ breaker rating
3000 W at 220 V, 0.9 power factor, 0.8 diversity and a 16 A breaker: 2400 W diversified, 12.12 A and 75.7% loading — sensible, with about 760 W spare.

How to work it out

  1. Count the load that will realistically run at the same time on this circuit — not the whole-house total, and not a naive sum of every appliance nameplate.
  2. Apply a diversity factor: 0.6-0.8 for dwellings, 0.7-0.9 for offices. A 3 kW induction hob, 2 kW air conditioner and 1.5 kW water heater total 6.5 kW, but at 0.8 that is 5.2 kW — and that is the design figure.
  3. Compute the design current I = Pc ÷ (U × cosφ). 5.2 kW at 220 V with cosφ 0.9 gives 26.3 A.
  4. Size the breaker: lower limit ≥ 1.1 × I to ride through normal fluctuation and small inrush, upper limit ≤ the cable capacity. 26.3 × 1.1 = 28.9 A, so a C32 fits.
  5. Check loading: 26.3 ÷ 32 = 82%. The comfortable band is 50-80%. Above 90% it runs hot and trips; below 40% the breaker is oversized and protects nothing.
  6. Size the cable last: capacity ≥ 32 A breaker rating. 4 mm² in conduit carries only 25.6 A, so use 6 mm² (about 32 A in conduit) or run it in free air.

Where it goes wrong

Material and cost

C16/C20 breakers run 20-40 CNY each for domestic brands and 60-120 CNY for Schneider or ABB. A 30 mA RCD is 80-200 CNY. A 12-way empty enclosure is 150-400 CNY. Devices only — wiring and internal dressing excluded.

On site

Basis

FAQ

Is a bigger breaker better?
The opposite. The breaker protects the cable, so its rating must be below the cable capacity. A 16 A breaker on 1.5 mm² (19 A) is sound; a 32 A breaker on the same cable will not trip at 25 A, and the conductor heats until the insulation melts and burns. That is the commonest origin of domestic electrical fires.
How is the diversity factor chosen?
It captures the gap between what is installed and what runs at once: 0.7-0.9 for domestic sockets, 0.9-1.0 for lighting, and 1.0 for lifts and fire equipment that must all work together. Too low and breakers trip; too high and you waste cable and money. A whole building's incoming supply can use 0.4-0.6, since no two households peak together.
Why must socket circuits have RCD protection?
Because sockets are what people touch, so a fault becomes a shock. The 30 mA threshold is set below the level that causes ventricular fibrillation, tripping within 0.1 s. Lighting circuits, mounted overhead and out of reach, may go without. An RCD does not replace earthing — they are complementary and both are needed.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Circuit Load and Breaker Calculator. 2026-10-25. https://jianzhujisuan.com/en/circuit-load

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.