Climbing Scaffold Calculator (Attached Lifting)
Enter the perimeter and storey height to get masts, frame height, standards and decking.
With the default inputs: Building length 30 m · Building width 16 m · Storey height 3.0 m etc.Lifting masts 21 pcsFrame height 13.5 m over 4.5 floors; 1242 m² of facade, only 14% of the floor area
Use your own dimensions ↓Inputs
Result
| Frame height | 13.50m |
| Facade protection area | 1242m² |
| Decking area | 662m² |
| Standards, two rows | 92bars |
| Standard length | 1242m |
| Ledger length | 1472m |
| Guide rail length | 284m |
| Hoists, one per mast | 21units |
| Protection per floor area | 0.144m²/m² |
How this is worked out
Masts, standards and lifts are counted up to whole units, never carried as decimals: 92 m of perimeter at 4.5 m gives 21 masts. Do not use floor area as the denominator: this building has 8640 m2 of floor area against 1242 m2 of facade, a factor of 7.0.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Perimeter | P = 2 x (length + width) |
| Frame height | H = floors covered x storey height, with H within five storeys and H x mast spacing within 110 m2 |
| Masts | N = perimeter / mast spacing, rounded up |
| Standards | count = perimeter / standard spacing x 2 rows, length = count x H |
| Lifts | n = H / lift height rounded up; decking = P x frame width x n |
| Ledgers | length = 2 x P x n, one inner and one outer per lift |
| Facade protection | area = P x H; guide rail length = masts x H |
FAQ
How many lifting masts does a climbing scaffold need?
Is climbing scaffold hired by floor area or by facade area?
Why is the frame limited to five storeys?
How does a climbing frame compare with a traditional tube-and-fitting scaffold per square metre?
What to calculate next
These jobs are done back to back on site — follow the steps to work through the whole sequence.
Scaffold systems: climbing, tube-and-fitting, ringlockStep 1 of 3
- 1Climbing Scaffold Calculator (Attached Lifting)
- 2Scaffolding Calculator
- 3Ringlock Scaffold Calculator (by component)
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Climbing Scaffold Calculator (Attached Lifting). 2026-10-25. https://jianzhujisuan.com/en/climbing-scaffold