算BuildCalc

Duct Area Calculator

Developed area for rectangular or round duct, plus insulation and steel weight.

Quick answer

With the default inputs: Section shape Rectangular duct · Long side 1000 · Short side 400 etc.Developed area 84.00 m²

Edit the inputs below to recalculate.
Long side mmShort side mmTotal duct length m
Rectangular duct area is 2 × (a + b) × length, flanges not deducted; round duct uses π × diameter × length. Insulation adds its own thickness ring.

Inputs

Ignored for round duct
Ignored for round duct
Only used for round duct
Low pressure: 0.6 up to 630 mm, 0.75 to 1000, 1.0 to 2000
25-40 mm elastomeric or glass wool is typical

Result

Developed area
84.00m²
Area per metre2.800m²/m
Total length30.0m
Insulation volume2.628m³
Cladding area91.20m²
Galvanised steel weight494.6kg
Sheet weight per m²5.89kg/m²
With 10% waste92.40m²

Measurement rules: rectangular duct area = 2 × (long + short) × length, round = π × D × length; flanges, stiffeners, access doors and test holes are not deducted, and seam allowances are not added. Insulation volume is the net volume enclosed by the insulated outline, (a+2δ)(b+2δ) − a·b, not area times thickness — the simple product misses the four corners.

Formula

Rectangular areaA = 2 × (long + short) × length
Round areaA = π × D × length
Rectangular insulationV = [(a + 2δ)(b + 2δ) − a·b] × length
Round insulationV = π ÷ 4 × [(D + 2δ)² − D²] × length
Steel weightW = A × thickness × 7850
30 m of 1000×400 rectangular duct at 0.75 mm with 30 mm insulation: 84 m² area, 2.628 m³ insulation, 91.2 m² cladding, 494.6 kg of galvanised sheet.

How to work it out

  1. Compute the developed area: rectangular A = 2 × (long side + short side) × length; circular A = π × D × length. It is perimeter times length, not cross-sectional area.
  2. Add an allowance of 8-12% for seams and flanges, at the upper end for small ducts, dense flanging and many fittings.
  3. Compute insulation volume: rectangular V = [(a+2δ)(b+2δ) − a·b] × length; circular V = π÷4 × [(D+2δ)² − D²] × length, where δ is insulation thickness.
  4. Compute cladding area using the outside perimeter after insulation, not the duct perimeter. This item is often 10% of the total price.
  5. Steel weight W = A × thickness × 7850 kg. Thickness follows GB 50243-2016: 0.5 mm up to 320 mm long side, 0.6 at 340-450, 0.75 at 480-1000, 1.0 at 1120-2000, 1.2 at 2500-4000.
  6. Report the three outputs — area, insulation volume and steel weight — because they map onto three different pricing bases: fabrication, insulation and material purchase.

Where it goes wrong

Material and cost

Galvanised ductwork fabricated and installed runs 90-150 CNY/m² including flanges and hangers, with insulation extra; stainless 200-350. Elastomeric insulation at 30 mm is about 25-40 CNY/m² of insulated surface; glass wool is half that but needs cladding. Prices vary widely with thickness, region and volume.

On site

Basis

FAQ

Why are flanges and access doors not deducted?
The measurement rule says so explicitly: duct area is taken without deducting access doors, test holes, supply or return grilles, flanges, stiffeners or hanger brackets, and seam overlap is not added either. These items are small relative to the duct body and the effort of deducting each exceeds the error. So pricing is simply area times rate.
Why not just multiply area by thickness?
Insulation wraps the outside, so the four corners are covered twice. For 1000×400 duct with 30 mm: the naive method gives 2.8 × 0.03 × 30 = 2.52 m³ while the correct one gives [(1.06×0.46) − 0.4] × 30 = 2.628 m³, a 4% shortfall. The smaller the section and the thicker the insulation, the bigger the gap — and elastomeric insulation is bought by volume.
How is duct sheet thickness chosen?
By system pressure class and the long side. Low pressure (up to 500 Pa): 0.5 mm up to 320, 0.6 to 630, 0.75 to 1000, 1.0 to 2000, 1.2 above. Medium (1500 Pa) and high (2500 Pa) classes go one step thicker and need stiffening frames. Undersized sheet pants audibly in service.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Duct Area Calculator. 2026-10-25. https://jianzhujisuan.com/en/duct-area