With the default inputs: Floor area 100 m² · Storey height 3 · Heat index 60 W/m² etc.Heating load 6.00 kW
Edit the inputs below to recalculate.Inputs
Result
| Building volume | 300m³ |
| Temperature difference | 23K |
| Load per m² | 60W/m² |
| Volume method check | 3.79kW |
| In kcal/h | 5160kcal/h |
| Radiator sections at 120 W | 50pcs |
| Gas consumption | 0.67m³/h |
| Season gas use | 971m³ |
| Season cost | 2718CNY |
The area index is an estimate, not a load calculation. A proper calculation takes each envelope element — walls, windows, roof, floor — at its U-value and adds infiltration and ventilation. The index depends heavily on insulation: housing to a 65% energy standard needs only 40-50 W/m² in the same climate where 1980s stock needs 80-100. Retrofit cost hinges on that number.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Load | area × heat index in watts |
| Volume check | volume × 0.55 × ΔT |
| Radiator sections | load ÷ output per section |
| Gas rate | Q × 3.6 ÷ (35.6 × efficiency) |
| Season use | hourly rate × hours/day × days |
| Units | 1 kW = 860 kcal/h = 3412 BTU/h |
Reference heating indices by building type
| Building type | Heat index W/m² | Note |
|---|---|---|
| Housing (65% efficiency) | 40-50 | Built in the last decade |
| Housing (50% efficiency) | 50-60 | Around 2010 |
| Older housing | 80-100 | No insulation, single glazing |
| Office | 70-100 | Including ventilation |
| School, nursery | 60-80 | Intermittent use |
| Retail | 80-120 | High fresh-air demand |
| Hospital | 80-120 | Runs 24 hours |
How to work it out
- Start with the area-index method: Q = floor area × heat index. Dwellings run 40-70 W/m² (high in severe cold zones, low in hot-summer/cold-winter zones), offices 60-80, schools 60-80, retail 80-120.
- Cross-check volumetrically: Qv = volume × 0.55 × (tn − tw). Agreement within 20% is fine; a wider gap means the index or the storey height is wrong.
- Apply orientation and position corrections: +15-20% for a top floor, +15% for an end unit, +10% for north-facing, another +10% for large glazed areas. Skip this and rooms in the same building end up 5°C apart.
- Radiator sections N = load ÷ output per section. A cast-iron four-column 760 gives about 130 W per section at standard conditions; steel panel radiators are rated per unit by the maker, with a correction for low water temperature.
- Gas rate V = Q × 3.6 ÷ (35.6 × efficiency). Natural gas has a net calorific value of 35.6 MJ/m³; conventional boilers run 0.85-0.90, condensing 0.95-1.05.
- Season consumption is the hourly rate times 8-12 equivalent full-load hours per day times the heating season length; running cost is that volume times the gas price.
Where it goes wrong
- Using structural area as floor area. They differ by 10-15% in multi-storey housing, which throws off the load and the boiler selection — and shows up as a boiler that runs constantly without warming the rooms.
- Estimating one radiator section per square metre. A cast-iron 760 gives 130 W per section, so a 20 m² room at 60 W/m² needs 9.2 sections. Twenty is waste; five leaves the room cold all winter.
- Skipping the orientation and exposure corrections. Without them, rooms in one building range from 16°C to 22°C, and the complaints all come from the coldest units.
- Using the gross calorific value. At 39.8 MJ/m³ it is 12% above net, so the gas estimate comes out low and the actual bill lands well above budget.
Material and cost
A 24 kW gas combi boiler costs 6000-15,000 CNY depending on origin and condensing capability; cast-iron radiators 60-120 CNY per section, steel panels 300-800 per unit. Gas is 2.5-3.5 CNY/m³; a 100 m² dwelling in north China burns 800-1200 m³ over a 120-day season, costing 2000-4000 CNY.
On site
- The heat index is a whole-building figure, not a room figure. For apartment-level metering or room-by-room control, calculate each room and never distribute the average.
- An oversized boiler short-cycles, which lowers efficiency and shortens life. 20-24 kW covers a 100 m² dwelling including domestic hot water; 28 kW is unnecessary.
- Radiators under windows create a warm curtain that blocks cold downdraught. Comfort is clearly better than side-wall mounting, and glazing condensation is reduced.
- When refurbishing an old house, look at the windows first. Replacing single glazing with double units cuts the load 15-20% — cheaper than adding radiator sections and it fixes condensation at the same time.
Basis
- GB 50736-2012 Design code for heating, ventilation and air conditioning of civil buildings, heating and envelope thermal parameters
- GB 50019-2015 Code for design of heating, ventilation and air conditioning of industrial buildings
- CJJ 34-2022 Standard for design of urban heating networks
FAQ
Why does the index vary twofold?
What indoor temperature is right?
Radiators or underfloor heating?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Heating Load Calculator. 2026-10-25. https://jianzhujisuan.com/en/heating-load