Soldier Pile Calculator

Pile count, concrete and reinforcement - with jet-grout cut-off, a full retaining line.

Also known as soldier pile wall · king post wall · soldier beam

Quick answer

With the default inputs: Wall length 60 m · Pile diameter 800 mm · Pile length 18 m etc.Number of piles 51 bars

Use your own dimensions ↓

Inputs

Usually 1.2-1.5× diameter; interlock where watertight

Result

Number of piles
51bars
Actual spacing1.20m
Volume per pile9.0m³
Total concrete461.4m³
Reinforcement41529kg
Tonnes41.5t
How this is worked out

This page is a quantity take-off only. It contains no code limits and no design - embedment depth, internal forces and reinforcement have to be worked out to JGJ 120-2012 separately. Piles sit on a centre spacing, count = ⌊length ÷ spacing⌋ + 1 with a pile at each end, then back-calculate the actual spacing. A soldier-pile line needs a cut-off between piles - jet grout, deep mixing or interlocking piles - or water and fines bleed through the gaps. The 90 kg/m³ reinforcement is an experience range for retaining piles (main bars + spiral + stiffeners), not a code value; use the placing drawing for a firm number. A capping beam ties the row together and is not included here.

Next up: High Strength Bolt Torque Calculator · Plaster and Render Calculator

Formula

Pile countn = ⌊length ÷ spacing⌋ + 1
Per pileV₁ = π×(d/2)² × length
ConcreteV = n × V₁
Reinforcement≈ concrete × 90 kg/m³
A 60 m wall, 800 mm piles, 18 m long at 1.2 m spacing: 51 piles, 9.05 m³ each, 461.6 m³ of concrete and about 41.5 t of reinforcement.

How to work it out

  1. Piles = ⌈retention length ÷ spacing⌉, spacing usually 1.5-2.5× the diameter (typically 1.2-2.0 m).
  2. Concrete = piles × π/4 × D² × length; length must satisfy embedment depth, not just reach the pit bottom.
  3. Reinforcement is about 90 kg/m³; a soldier pile works in bending, so main bars go on the tension side.
  4. The capping beam must be continuous, tying the row into a single unit that acts together.
  5. Seal between piles with interlocking jet-grout or mixing columns, or a shotcrete facing over mesh, to stop soil loss.

Where it goes wrong

Material and cost

Bored soldier piles run mid-range all-in (piles + capping beam + inter-pile seal), cheaper than a diaphragm wall, and are the mainstream retention for medium-depth pits. Diameter, spacing and embedment drive the cost - optimise these three and you save money.

On site

Basis

FAQ

How wide can soldier pile spacing be?
Two things cap it: soil arching between piles (too wide and soil squeezes through the gaps) and the cut-off (wider gaps are harder for jet grout to seal). Common practice is 1.2-1.5× diameter, so 800 mm piles at 1.0-1.2 m. Soft ground, sand and a high water table call for tighter spacing, or interlocking (tangent) or double-row piles.
How is pile length set?
Excavation depth plus embedment, set by stability. The toe must penetrate stable ground below formation, usually 0.3-1.0 times the excavation depth (more in soft ground), and satisfy overall stability and base heave checks. So length is dig depth plus embedment, not just to formation. Too long is wasted, too short kicks out at the toe - the design must set it from soil parameters.

What to calculate next

These jobs are done back to back on site — follow the steps to work through the whole sequence.

Retaining: pressure to supportStep 3 of 4

  1. 1Earth Pressure Calculator
  2. 2Retaining Wall Stability Calculator
  3. 3Soldier Pile Calculator
  4. 4Ground Anchor Calculator

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Soldier Pile Calculator. 2026-10-25. https://jianzhujisuan.com/en/soldier-pile

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.