Pipe size chart (DN to inch)

DN15 to DN300: the inch equivalent, outside diameter, common wall, weight per metre and external area for insulation take-off.

DNInchOutside dia (mm)Wall (mm)Weight (kg/m)Area (m²/m)
DN151/2"21.32.81.280.067
DN203/4"26.92.81.660.085
DN251"33.73.22.410.106
DN321¼"42.43.53.360.133
DN401½"48.33.53.870.152
DN502"60.33.85.290.189
DN652½"76.14.07.110.239
DN803"88.94.08.370.279
DN1004"114.34.010.880.359
DN1255"139.74.013.390.439
DN1506"168.34.518.180.529
DN2008"219.16.031.530.688
DN25010"273.06.542.720.858
DN30012"323.97.961.561.018

All values are computed from the stated formulas; ranges show the usual spread. Use measured data or the local code where it differs.

How to use this table

Common misuse

Calculate the actual number

Other reference tables

FAQ

What is DN50 in inches?
Two inch, 60.3 mm outside diameter, commonly 3.8 mm wall, 5.29 kg per metre.
What is the outside diameter of DN25?
33.7 mm, which is 1 inch. Note the outside diameter is 8.7 mm larger than the DN, so fittings are selected on outside diameter.
What is the difference between DN, De and Φ?
DN is a nominal size close to the bore but not exact; De is the outside diameter of plastic pipe; Φ usually means outside diameter × wall thickness. They are not interchangeable.
Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.