Construction unit conversions

The handful of conversions that actually get used, on one page — especially kN/kgf and MPa/kgf/cm², where most errors happen.

QuantityConversionWhere it matters
Length1 m = 1000 mm = 100 cm = 3.2808 ft = 39.370 inDrawings in mm, bills in m
Length1 in = 25.4 mmPipe and section sizes
Area1 m² = 10.7639 ft² = 10000 cm²Imported material priced per ft²
Volume1 m³ = 1000 LConcrete, mortar, water
Volume1 m³ = 35.3147 ft³ = 1.30795 yd³US drawings and equipment
Mass1 t = 1000 kg = 2204.6 lbSteel and aggregate by the tonne
Force1 kN = 1000 N = 101.97 kgf ≈ 0.102 tfStructural loads are in kN
Force1 kgf = 9.80665 NOlder drawings use kgf
Stress1 MPa = 1000 kPa = 1 N/mm² = 10.197 kgf/cm²C30 means 30 MPa, about 300 kgf/cm²
Pressure1 atm = 101.325 kPa = 1.033 kgf/cm²Pumps and compressed air
Power1 kW = 860 kcal/h = 1.3596 hpHVAC and plant selection
Energy1 kcal = 4.1868 kJ, 1 kW·h = 3600 kJEnergy conversion
Slope30° = 57.74% = 1:1.732Codes use percent
Flow1 m³/h = 0.2778 L/s = 16.667 L/minPumps and pipe sizing

All values are computed from the stated formulas; ranges show the usual spread. Use measured data or the local code where it differs.

Where these numbers come from: The conversion factors are definitional values (1 kgf = 9.80665 N, 1 in = 25.4 mm and so on), fixed by GB 3100-1993 and ISO 80000; they do not change with code revisions.

US customary units: read this first on an American or British drawing

US unitIn metricReverseWhere you meet it
1 psi6.89476 kPa1 kPa = 0.14504 psiUS steel and concrete strength, pressures
1 ksi6.89476 MPa1 MPa = 145.04 psiUS structural steel grades (Fy = 50 ksi for A992)
1 psf47.8803 Pa1 kPa = 20.885 psfFloor live loads, roof loads
1 ksf47.8803 kPa1 MPa = 20.885 ksfBearing capacity (2 ksf is about 96 kPa)
1 kip4.44822 kN1 kN = 0.2248 kipColumn axial loads, prestress forces
1 kip/ft14.5939 kN/m1 kN/m = 0.06852 kip/ftLine loads on beams
1 in·lb0.112985 N·m1 N·m = 8.851 in·lbTorque on small bolts
1 ft·lb1.35582 N·m1 N·m = 0.7376 ft·lbTorque on large bolts, impact energy
1 inH₂O (60°F)249.089 Pa1 kPa = 4.015 inH₂ODuct static pressure, cleanroom differential
1 ft³0.0283168 m³1 m³ = 35.315 ft³Concrete by the cubic yard, timber by the board foot
1 yd³0.764555 m³1 m³ = 1.30795 yd³The unit US ready-mix concrete is sold in
1 board foot0.00235974 m³1 m³ = 423.78 board ftNorth American timber (1 board foot = 1 ft² one inch thick)
1 acre4046.86 m²1 ha = 2.47105 acreSite areas, land acquisition
1 short ton907.185 kg1 t = 1.10231 short tonUS steel and aggregate are priced by the short ton
1 US gal3.78541 L1 m³ = 264.17 US galCoatings and admixtures (mind the imperial gallon at 4.546 L)

Every factor is derived from a defined value (1 in = 25.4 mm and 1 lb = 0.45359237 kg are definitions, not measurements), so there are no edition differences. Pressure is where people come unstuck: 1 MPa = 145 psi, two orders of magnitude. Read 30 MPa as 30 psi and the concrete comes out at 0.2 MPa; read 4000 psi as 4000 MPa and the number is useless. US concrete is ordered in 3000, 4000 and 5000 psi, which is 20.7, 27.6 and 34.5 MPa.

How to use this table

Common misuse

Calculate the actual number

Other reference tables

FAQ

How many kg is 1 kN?
About 102 kgf. So a floor rated at 200 kg per square metre is roughly 2 kN/m².
How many kgf/cm² is 1 MPa?
10.197, rounded to 10 on site. C30 concrete is 30 MPa, about 300 kgf/cm².
What angle is a 2% fall?
arctan(0.02) = 1.15°, i.e. 20 mm per metre.
What is 4000 psi in MPa?
4000 × 0.00689476 = 27.58 MPa, usually written 27.6 MPa or taken as C28. US concrete comes in 3000, 4000, 5000 and 6000 psi, which is 20.7, 27.6, 34.5 and 41.4 MPa.
What is a kip?
1 kip = 1000 lbf = 4.448 kN - a kilopound-force. US structural drawings use it for column axial loads and prestress forces, written kip or k. Multiply by 4.448 to get kN.
How do psf and kPa convert?
1 psf = 47.88 Pa and 1 kPa = 20.885 psf. The common US live loads of 40, 50 and 100 psf are 1.92, 2.39 and 4.79 kPa. Since 1 kPa = 1 kN/m², the kN/m² figure is the same number.
Fahrenheit to Celsius — why is 32 added sometimes and not others?
There are two different quantities. A temperature value takes the offset, °F = °C × 9/5 + 32, so 30 °C is 86 °F. A temperature difference does not: Δ°F = Δ°C × 9/5, so a 20 °C differential is 36 °F. Structural temperature effects and concrete curing differentials are both the second kind — apply the offset to one of those and a 20 °C range becomes 68 °F, trebling the load.
What are Btu/h and a ton of refrigeration in kW?
1 W = 3.41214 Btu/h, so 1 kW is 3412 Btu/h. One US ton of refrigeration is 12,000 Btu/h, which is 3.51685 kW. A 36,000 Btu/h unit is therefore 3 tons or 10.55 kW. US mechanical schedules are written in Btu/h and tons, while Chinese and European equipment is rated in kW — never carry the number across.
Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.