Gravel Base Calculator (Yards & Tons)

Feet and inches to cubic yards and tons by stone type.

Also known as gravel quantity · aggregate base · sub base volume

Quick answer

With the default inputs: Length 20 ft · Width 10 ft · Depth 4 in etc.Gravel to order 2.96 yd³

Use your own dimensions ↓

Inputs

ft
ft
in

Result

Gravel to order
2.96yd³
Compacted volume66.7ft³
Loose volume to buy80.0ft³
Cubic yards2.96yd³
Density105lb/ft³
Total weight8400lb
Short tons4.20ton
Wheelbarrows at 3 ft³27loads
Coverage per yard81ft²
How this is worked out

Volume is length x width x depth with depth divided by 12. Loose aggregate settles when compacted: graded crushed stone typically loses 15-25%, and 20% is the common allowance. Pea gravel barely compacts at all, which is why the compaction option really only applies to crushed stone and crusher run. Tonnage is volume times unit weight, and unit weight depends on moisture and grading - wet material runs 10-15% heavier. Order by the cubic yard rather than by the ton, because the yard weighs on its own scale and the two rarely agree.

Next up: Backfill Volume Calculator · Earthwork Calculator

Formula

Volume (ft³) = L × W × D(in)/12
Loose = compacted × 1.2about 20% settlement for graded stone
Cubic yards = ft³ ÷ 271 yd³ = 27 ft³
Tons = ft³ × density ÷ 2000crushed stone ≈ 105 lb/ft³
A 20 ft x 10 ft driveway at 4 in of compacted crushed stone: 66.7 ft³ compacted, 80 ft³ loose = 2.96 cubic yards, about 4.2 short tons, or roughly 96 wheelbarrows. That is a dozen trips by pickup - have a load delivered, most yards start at 10 to 15 yards.

How to work it out

  1. Measure the area (length x width in feet) and the design compacted depth in inches.
  2. Volume = length x width x depth/12, which gives the compacted cubic feet.
  3. Multiply by 1.2 for the loose volume - graded crushed stone settles about 20%, and that is what you buy.
  4. Divide by 27 for cubic yards, or multiply by unit weight (105 lb/ft³ for crushed stone) and divide by 2000 for short tons.
  5. Check how the yard quotes - by the yard or by the ton - because delivered quantity can differ by 10% between the two.

Where it goes wrong

Material and cost

Crushed stone sells by the ton at roughly USD 30-60 or by the yard at USD 40-80, depending on how far the quarry is. Haulage is often the biggest line: a 10 yard load runs USD 100-200 short haul and adds per mile beyond about 20 miles. Hauling yourself works out at 1-2 yards per pickup load, so dozens of trips cost more in fuel than delivery would.

On site

Basis

FAQ

How many yards in a ton of gravel?
Crushed stone runs about 1.35-1.45 short tons per cubic yard, so one ton is roughly 0.7-0.75 yards - use 0.74. Crusher run is heavier at about 1.5 tons per yard and pea gravel lighter at 1.35. Instead of memorising factors, convert from unit weight: tons = yards × 27 × density ÷ 2000.
How deep should the base be?
4 in compacted for walkways and patio pavers, 6 in for a car driveway, 8-10 in for an RV or light truck, and 4 in under a shed or container pad. Build it in lifts - no more than 4 in loose before compacting. Eight inches placed at once only compacts the surface and the base settles within a season.
Why add 20% for compaction?
Loose aggregate is full of voids between particles. Vibratory compaction works fines into those voids and rearranges the particles, so the volume drops. Well-graded stone with both coarse and fine particles settles more; single-size pea gravel barely at all. The design thickness gives you a compacted volume, so you must buy the loose volume or you will come up short before reaching design depth.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Gravel Base Calculator (Yards & Tons). 2026-10-25. https://jianzhujisuan.com/en/gravel-base-yards

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.