Paver Base and Sand Calculator

Gravel base and bedding sand from one area figure.

Also known as paver sub base · sand bedding · paver sand

Quick answer

With the default inputs: Paved area 200 ft² · Base depth 4 in · Bedding sand depth 1 inGravel base 2.96 yd³

Use your own dimensions ↓

Inputs

ft²
in
in

Result

Gravel base
2.96yd³
Base in tons4.20ton
Loose base volume80.0ft³
Bedding sand volume16.7ft³
Sand weight1667lb
Sand in 50 lb bags34bags
Max sand depth1.00in
Total excavation5.0in
How this is worked out

Base depth is given compacted, but you buy loose volume - graded stone settles about 20%, hence the loose volume line. Bedding sand is 1 in and never more than 1.5 in: a thick sand bed is why pavers rock and settle, and levelling an uneven base by adding sand is the single most common error. Total excavation is base plus sand, but add the paver thickness itself (commonly 2⅜ in) to work out the finished level against surrounding ground. Use concrete or masonry sand, not beach sand and not anything high in clay.

Next up: Backfill Volume Calculator · Earthwork Calculator

Formula

Loose base = area × depth/12 × 1.220% compaction allowance
Base yards = loose volume ÷ 27
Sand volume = area × sand depth/12sand is not compacted
Sand bags = weight at 100 lb/ft³ ÷ 50
200 ft² with 4 in of base and 1 in of sand: base compacts to 66.7 ft³, loose 80 ft³ = 2.96 yd³ or about 4.2 tons; sand is 16.7 ft³, 1670 lb, 34 bags of 50 lb. Excavation is 5 in plus the paver thickness for the finished depth.

How to work it out

  1. Measure the paved area and deduct anything not being paved.
  2. Set the compacted base depth: 4 in for foot traffic, 6 in for cars, 8-10 in for trucks.
  3. Loose base = compacted volume x 1.2, since graded stone settles about 20%.
  4. Bedding sand is 1 in and should never exceed 1.5 in.
  5. Dig depth = base + sand + paver thickness, commonly 2⅜ in for block pavers.

Where it goes wrong

Material and cost

Base gravel runs USD 40-80 per yard and sand 30-50 per yard or 4-6 per 50 lb bag. Paving complete, including excavation, base, sand, units and cutting, commonly runs USD 10-25 per ft², with the pavers themselves at 30-50% of that. DIY on 200 ft² is roughly 400-800 in materials.

On site

Basis

FAQ

Why keep the sand bed to 1 inch?
The sand only levels and beds the units, it does not carry load. Past about 1.5 in the sand flows sideways underfoot, the pavers go out of plane, and once rain washes it away the surface starts to settle. Build the base to within 3/8 in and put down 1 in of sand. If the base is out, redo the base - sand is not a levelling fix.
Is 4 inches of base enough?
4 in is fine for walkways and patios, 6 in for a car driveway, 8-10 in for an RV or truck. Soil matters too: clay needs extra depth plus a geotextile separator, while sandy soil can use the standard depths. Compact in lifts of 4 in or less - 8 in placed at once only compacts at the surface.
Do I sweep sand into the joints afterwards?
Yes. After compacting, sweep fine sand into the joints, water it in and repeat two or three times until the joints hold. That sand locks the units and stops lateral movement. Polymeric sand lasts longer but needs dry conditions, cannot be topped up after wetting and costs noticeably more. Joint sand runs about 1-2 bags of 50 lb per 100 ft².

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Paver Base and Sand Calculator. 2026-10-25. https://jianzhujisuan.com/en/paver-base

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.