Mulch Calculator
Area and depth to cubic yards and bags.
Also known as mulch volume · bark mulch · mulch coverage
With the default inputs: Bed area 300 ft² · Spread depth 3 in · Waste 5%Mulch required 2.92 yd³
Use your own dimensions ↓Inputs
Result
| Cubic feet | 78.8ft³ |
| Bags of 2 ft³ | 40 |
| Bags of 3 ft³ | 27 |
| Coverage per yard | 108ft² |
| Pickup loads at 2 yd³ | 1.5loads |
How this is worked out
Volume is area x depth/12, divided by 27 for cubic yards. Depth is the variable that matters: 3 in suppresses weeds and holds moisture, under 2 in barely works, and over 4 in starves the soil of air so roots grow up into the mulch and die in the first dry spell. Do not cone mulch up against the trunk - it is common practice and it rots the bark. Keep 2-3 in clear of the trunk and spread it as a ring. Bag versus bulk pricing diverges sharply: bags commonly cost two to three times as much for the same volume, so above 2 yards order bulk.
Next up: Backfill Volume Calculator · Earthwork Calculator
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Volume (ft³) = area × depth(in)/12 | |
| Cubic yards = volume ÷ 27 | 1 yard = 27 ft³ |
| Bags = volume ÷ 2 (2 ft³ bags) |
How to work it out
- Measure the bed area, breaking irregular shapes into rectangles - far closer than estimating.
- Use 3 in as the general optimum, and only 1-2 in as a top-up over existing mulch.
- Volume = area x depth/12, divided by 27 for cubic yards.
- For bags divide by 2 (2 ft³ bags), but above 2 yards bulk costs about half.
- Keep mulch 2-3 in clear of tree trunks rather than coning it up against them.
Where it goes wrong
- Spreading 4 in or more - roots grow up into the mulch for air and die in the first drought. Good intentions, dead shrub.
- Coning mulch against the trunk - the bark stays wet and rots, girdling the tree. Worse than no mulch at all.
- Adding 3 in every year - layers build into a water-shedding crust and the bed ends up drier than before.
Material and cost
Bulk mulch runs USD 25-45 per yard for bark and woodchip, and coloured mulch 40-70. Bagged 2 ft³ is 3-5 a bag, which works out at 40-70 per yard - so above 2 yards order bulk without thinking about it. Delivery is 50-150; collecting it yourself saves that if you can carry it.
On site
- Leave a 6 in clear strip at the wall exposing the foundation - termites start in damp mulch piled against the house.
- Clear weeds and lay newspaper or cardboard (never plastic) underneath; regrowth drops sharply.
- Fresh mulch ties up nitrogen at the surface, so fertilise beneath it or use well-rotted compost.
Basis
- State Cooperative Extension gardening guidance (the 2-4 in mulch depth range)
- Local yard waste and composting regulations (some areas limit depth against walls)
FAQ
What depth should I use?
Bags or bulk?
Does mulch attract termites?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Mulch Calculator. 2026-10-25. https://jianzhujisuan.com/en/mulch-yardage