Topsoil Calculator
Area and depth to yards, tons and bags.
Also known as topsoil volume · soil quantity · fill volume
With the default inputs: Area 500 ft² · Spread depth 4 in · Settlement Will settleTopsoil required 7.10 yd³
Use your own dimensions ↓Inputs
Result
| Design volume | 166.7ft³ |
| Order volume with settlement | 191.7ft³ |
| Tons at 100 lb/ft³ | 9.58ton |
| Bags of 1.5 ft³ | 112 |
| Pickup loads at 1.5 yd³ | 4.7loads |
| Tons per yard | 1.35ton/yd³ |
How this is worked out
Fresh topsoil settles 10-20%, so order 15% over design - skip it and the bed drops as soon as you water, and topping up a small amount costs a full delivery. Compacted backfill does not need the allowance. Lawns take 4-6 in, beds 6-8 in, and 1-2 in is enough for a thin levelling coat. Unit weight is about 100 lb/ft³, roughly 1.35 tons per yard, with wet soil 10-15% heavier. If you are buying by the ton, ask whether that is wet or dry weight - wet soil by weight short-changes the volume you get.
Next up: Backfill Volume Calculator · Earthwork Calculator
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Volume (ft³) = area × depth/12 | |
| Order = volume × 1.15 | settlement allowance |
| Cubic yards = order ÷ 27 | |
| Tons = order × 100 ÷ 2000 | topsoil ≈ 100 lb/ft³ |
How to work it out
- Measure the area and calculate volume at the design depth.
- Lawns take 4-6 in, beds 6-8 in, and a thin levelling coat 1-2 in.
- Order 15% over the design volume for settlement - fresh topsoil drops once watered.
- Divide by 27 for cubic yards, or multiply by 100 lb/ft³ and divide by 2000 for tons.
- Firm the existing ground first, or the new layer keeps settling with it.
Where it goes wrong
- Skipping the settlement allowance - one watering and the bed is two inches low, and a small top-up costs a full delivery.
- Laying straight onto compacted subsoil - the interface sheds water and roots never get through.
- Buying wet soil by the ton - moisture goes from 10% to 25% after rain, so a ton is a tenth less soil.
Material and cost
Bulk topsoil runs USD 25-50 per yard delivered short haul, and blended garden soil 40-80. Bagged 1.5 ft³ is 3-6 a bag, which is 55-110 per yard - only sensible for small areas. Screened topsoil costs 30-50% more than unscreened but usually repays it in weeding and levelling.
On site
- Ask for clay and organic content: high-clay topsoil sets like brick and anything under 2% organic is poor.
- If the subsoil is compacted, loosen 2-3 in and mix it into the new layer rather than leaving a horizontal boundary.
- Rake level, firm lightly and water once thoroughly so settlement happens in one go before you sow or lay turf.
Basis
- ASTM D5268 Standard Specification for Topsoil Used for Landscaping Purposes (gradation and organic content)
- State Cooperative Extension lawn and garden guidance (spread depths)
FAQ
What is the difference between topsoil and garden soil?
What prep does the ground need?
Why is buying by the ton a bad deal?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Topsoil Calculator. 2026-10-25. https://jianzhujisuan.com/en/topsoil-yardage